flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

250-unit rental building opens in Brooklyn

Multifamily Housing

250-unit rental building opens in Brooklyn

CetraRuddy designed the project.


By David Malone, Associate Editor | April 2, 2021
The Lois exterior courtyard

Photos: Cameron Blaylock

The Lois, an eight-story, 250-unit residential building, has opened on the border of Prospect-Lefferts Gardens and East Flatbush in Brooklyn. The building features a mix of middle-income and market rate residences from studios to three bedrooms as well as 6,000 sf of ground floor retail.

The $105 million, 227,000-sf project includes amenities such as an expansive roof terrace with barbecues, a top-floor tenant lounge, a gym with a separate yoga room, a children’s room with a private outdoor play area and splash pad, a screening room, a self-service pet spa, a quiet lounge, and a game room. Residents also have access to 125 parking spaces and a 41-unit tenant storage room in the cellar.

 

The Lois rooftop space

 

The building’s facade features recessed masonry expressions and copper panel accents meant to reference the growing neighborhood’s industrial past. Apartment units include washers and dryers, stainless steel appliances, hardwood floors, and central heating and cooling though an energy efficient VRF system.

The LEED Platinum certified building has set aside 75 units (30% of the building’s total) for households earning between 110% and 130% of Area Median Income. The Lois is the second building in a phased project bringing a total of more than 400 apartments to Brooklyn’s East Flatbush – Prospect-Lefferts Gardens neighborhood. The first building, The Clark at 310 Clarkson Avenue, opened in 2019.

 

The Lois apartment living room

 

The Lois apartment kitchen space

Related Stories

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021