flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

11 tips on how to install EV charging stations in multifamily housing

Multifamily Housing

11 tips on how to install EV charging stations in multifamily housing

A top sustainability expert gives the whys and wherefores of installing electric vehicle charging posts in your next multifamily enterprise.


By PAUL BERGERON, CONTRIBUTING EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | June 23, 2020
EV charging port at The Kensington, Boston. Photo:

EV charging port at The Kensington, Boston. Photo: Gustav Hoiland

Electric vehicle adoption is expected to grow at a 25% annual clip over next five years. That’s going to make the installation of electric charging stations a must at apartment communities in most major real estate markets. Having EV stations on your property can lift its value, help you retain residents, and give your marketers another plus to attract prospective renters in competitive multifamily markets.

For advice on how best to install EV charging stations in multifamily enterprises, we turned to Pete Zadoretzky, LEED AP O+M, Vice President – Sustainability, Bozzuto Management Company. The company owns and manages more than 250 apartment communities, about two-thirds of which have EV stations. Bozzuto recently was named Energy Star’s Partner of the Year–Energy Management for the fourth year in a row—the only 100% multifamily management company to do so.

 

THE TIME IS RIGHT FOR EV CHARGING PORTS IN MULTIFAMILY HOUSING

1. Start thinking now about EV charging stations.

Nearly half of respondents (48.6%) to our exclusive Multifamily Design+Construction “Amenities Survey 2019” said they had installed EV chargers  in multifamily projects, up from 42.0% in our 2017 survey. That means most multifamily developers and their project teams have yet to install EV charging stations.

“It used to be, developers would ask, How much? And when they saw the price, it was, Thanks, but no thanks,” said Zadoretzky, a Fitwell Ambassador. (A 2016 study in San Francisco found that the cost of installing 12 PV ports in a 60-space parking lot was about $860/port, $2,370/port for a retrofit.) According to Zadoretzky, sticker shock has all but evaporated as the cost to install and operate EV stations keeps coming down.

 

2. Do your homework early in the planning process.

Apartment owners and investors must take the pulse of local market EV demand. Zadoretzky said his company’s preferred charging-station provider, ChargePoint, helps him track the number of EV vehicle registrations at a given time in a given market. “You’ll find a big difference between the number of EVs in, say, suburban Pennsylvania compared to Northern Virginia,” where it’s much higher, he said.

 

3. Determine the right number of EV charging ports for your property.

“For new construction, it’s important to be thinking strategically about what makes sense when the property first opens and what, when, and how you will be able to increase your capabilities at that property as it matures,” Zadoretzky said.

There was a time when two ports were enough, he said. “Now, we have apartment communities delivering with dozens of stations,” said Zadoretzky. “You don’t want to lose a single lease because there aren’t enough charging stations.”

There’s no perfect yardstick, but the “Guide to EV-Ready Communities” suggests that about 10% of all parking spaces in multifamily housing complexes should be dedicated to charging electric vehicles.

 

4. Check out the plentiful equipment and supplier options.

 “Plug in America,” a resource site for all things EV, lists more than 50 manufacturers and installers; Energy Star profiles about 20. Blink Charging, ChargePoint, and SemaConnect are the best-known full-service providers for multifamily and mixed-use communities. Electrify America, EVGo, and Volta Charging are more common for the retail-facing side of mixed-use communities. Tesla has its own proprietary stations.

Do your homework, advised Zadoretzky. “Looking back on Bozzuto’s history with EV stations, we learned the hard way that not all equipment is created equal,” he said. “You get what you pay for.”

 

Electric vehicle charging station in an apartment complex

Electric vehicle charging station in an apartment complex: just tap to start the charging process. Photo: Courtesy ChargePoint

 

Zadoretzky said his company chose ChargePoint because it offered an open platform, fully integrated with Bozzuto’s property management software. The ports’ LCD screens and messaging functions are user friendly.

The stations are open to the public. EV drivers can locate a charging station by searching and getting alerts via the ChargePoint EV app or the PlugShare app, which lists more than 140,000 charging stations in the U.S. and Canada. Retail guests patronizing the mixed-use complex’s restaurants and stores can charge their EVs while they dine and shop; they pay via the ChargePoint app. “Apartment management companies love having cars visiting the property because it brings prospective residents onto the property,” said Zadoretzky.

A second option—at roughly one-third the price—provides an assigned space, one port per customer for the term of the lease, as long as the lessee has an electric vehicle. “It’s a stripped-down version,” Zadoretzky said. “It’s more efficient, but only one car can use it.”

 

DEVELOP YOUR SCOPE OF WORK FOR EV CHARGING PORTS

5. Dig into the physical demands of installing EV charging stations.

Initial costs should be baked into your project’s electrical contracting scope of work and budget. A lot of questions have to be answered, said Zadoretzky: How close will the EV spaces be to the electrical room? Will you have to run a lot of conduit? Will you need to expand the size of the nearest electrical panel from original design loads? If it’s a retrofit in, say, a garden apartment community, how much trenching needs to be done to lay the conduit? How deep will you have to dig? Will you have to dig through established landscaping? Through asphalt? If you’re installing the EV stations in a structured parking garage, will the installers need to x-ray the concrete?

As for the cost of installing EV chargers in existing apartment properties, Zadoretzky offered these crystal clear guidelines: “You can analyze numbers all you want, but we know for sure that it can cost three times or even five times more to build EV ports on an existing property compared to new development.”

 

6. Determine your operating costs.

“There’s no blanket answer to operating costs,” Zadoretzky said. Among the many variables to consider: Will the EV stations be installed in a  mixed-use project or a 100% residential one? Is parking assigned to the residents, or is the lot first come, first served? Is there a monthly parking fee for an assigned space? Is there a shortage of parking spaces in the complex? Will parking spaces have to be removed to make way for the ports’ electrical equipment? Will the EV chargers be located on the property or in an adjacent area?

Zadoretzky described a property Bozzuto manages in Boston. Its six ports consumed 19MWh over a 12-month period, at a rate of $0.135/kWh. “That’s about $2,550 for the year, or about $425/port,” he said. “A lot for a building amenity for sure, but a drop in the bucket of the overall building’s energy use—and a non-issue in most cases, as we are recouping the cost of electricity directly from our EV-charging residents.”

 

7. Look for financial subsidies and incentives.

Government subsidies at the federal, state, and local level can significantly reduce first costs.

“You need to check out any state subsidy programs and combine those with incentives from utility companies for real savings,” Zadoretzky said. “The subsidies vary from state to state, and they are constantly changing. Right now, Massachusetts has one of the best around—not quite 100%, but pretty close. Maryland has excellent state and utility incentives.” Zadoretzky said he’s been surprised that some cities, like Washington, D.C., and whole states (Florida, for example) offer no incentives at all.

According to RCLCO’s 2020 EV Charging Report, commercial incentives can be significant, often covering 50–100% of an EV charger’s hardware, make-ready, ongoing service costs, and station/infrastructure installation. For example, Colorado provides rebates to multifamily property owners for up to 80% of charging station cost. Hawaii will subsidize 100% of the cost of installation.

A 2018 industry survey by CleanTechnica revealed that about 16% of charging station installations obtained government subsidies totaling more than $1,000 per connector, while another 20% received benefits of less than $1,000 per port. But in California, various jurisdictions offer incentives ranging from $3,000 per port to as high as $10,000 for ports in affordable housing communities. A Colorado program offers $9,000 per port for Level 2 smart chargers. Check cleantechnica.com for state-by-state data.

 

8. Think ahead about the day-to-day management of EV charging stations.

Zadoretzky said Bozzuto’s EV partner, ChargePoint, provides a customer-facing app and a management-facing dashboard that produce real-time information for both property staff and residents. If, for example, a tenant has been using the charger for too long, the dashboard will alert the property manager, who can then ask the tenant to unplug and move the car. Or, the property manager could program the dashboard not to charge a new tenant for a stipulated period as part of the lease signing.

ChargePoint has a Wi-Fi–enabled solution that provides real-time diagnostic data to property management staff. It also tracks and reports carbon emissions data, which is crucial when sharing information with investors or in complying with mandated benchmarking ordinances, said Zadoretzky.

“They’re monitoring our stations 24/7/365. If something goes wrong, their team is there to support us, right away, he said. “That’s crucial.” Usually it’s just a matter of a FaceTime phone call between ChargePoint and a Bozzuto maintenance technician to fix the problem using the display screen on the port.

 

9. Don’t forget to play the sustainability card.

Properties can earn points toward LEED certification by providing charging stations to serve at least 2% of parking spaces. To qualify for LEED points, EV charging spots must be Level 2 or higher, connected to a network, capable of supporting demand response or time-of-use charging, and compatible with universal EV charging connectors.

 

10. Beef up your EV marketing and signage.

Zadoretzky said his company made a strategic decision that EV charging stations would be an extension of the apartment community’s brand, and that they must match the customer service levels residents expect from Bozzuto. The availability of EV charging ports should also be highlighted in the community’s marketing package and in the walking tour.

Zadoretzky said he’s amazed that Craigslist is the only apartment listing site that allows prospects to list the availability of EV charging ports. “At Bozzuto, we get an average of about two requests per month via searches for each of our properties that has EV stations,” he said.

At the property management level, Zadoretzky strongly recommended putting up clearly visible signage that identifies the EV ports to residents and guests. “EV owners do not want to come home to their apartment, only to find another car parked in the space with the EV charging port,” he said. “Apply penalties if you have to.”

 

'EV READY' CHARGING IS IN YOUR FUTURE

11. Bone up on “EV-ready” building code requirements.

An EV-ready code is one that requires that a building’s electrical capacity and other infrastructure to be ready to install charging posts if and when there is sufficient demand. According to EVConnect, EV-ready codes may require a certain percentage of parking spots to have:

  • A dedicated electrical circuit with sufficient capacity for each charging spot
  • Installation of the conduit and wire necessary to run electricity to EV charging spots
  • Electrical panels labeled “EV-ready” and positioned near where tenants will park
  • Preparation for EV charging at a certain percentage of parking spots in multifamily housing

Since 2017, Atlanta has required new multifamily communities to make 20% of parking spaces EV ready. St. Louis Park, a suburb of Minneapolis (2018 population: 49,039), requires 10% of all parking in new apartment complexes to be EV ready. In 2019, Seattle started requiring apartment projects with one to six units to have an equal number of EV-ready spaces; those with seven to 25 units must have at least six EV-ready slots, and those with more than 25 parking spaces must make 20% EV ready.

In January, the International Code Council approved a provision that, if implemented by states or local jurisdictions, will require multifamily projects with three or more than units to have one EV-ready parking space if there is only one parking spot; two EV-ready slots if there are up to 25 parking spaces; and 20% of total parking spaces (rounded up, if there’s a remainder) for apartment communities with more than 25 spaces.

 

TIME TO GET CHARGED UP

So, if you’re a newby to electric vehicles, when is the right time to start installing EV charging stations in your apartment communities? “The best time,” said Zadoretzky, “is before you even know you want one.”

 

THE DOE’S THREE LEVELS OF EV CHARGING PORTS

There are three major categories of EV chargers (sometimes referred to as EVSEs, for “electric vehicle supply equipment”), based on the maximum amount of power the charger can provide to the battery.

  • Level 1 Uses a 120-volt AC plug. Delivers 2–5 miles of range per hour of charging. Used primarily in single-family homes.
  • Level 2 Provides charging through a 240-volt (for residential) or 208-volt (for commercial) plug. Requires installation of additional charging equipment. Can deliver 10–20 miles of range per hour of charging. The most common station type for multifamily communities.
  • DC Fast Charge Provides charging through 480-volt AC input. Requires highly specialized, high-powered equipment as well as special equipment in the vehicle itself. (Plug-in hybrid electric vehicles typically do not have fast-charging capabilities.) Can deliver 60–80 miles of range in 20 minutes of charging. Used most often in public charging stations.

Charging times range from less than 30 minutes to 20 hours or more based on the type of electric vehicle supply equipment in use, as well as the type of battery, how depleted it is, and its capacity.

 

Related Stories

| Aug 11, 2010

Luxury high-rise meets major milestone

A topping off ceremony was held in late October for 400 Fifth Avenue, a 57,000-sf high-rise that includes a 214-room luxury hotel and 190 high-end residential condominiums. Developed by Bizzi & Partners Development and designed by Gwathmey Siegel & Associates Architects, the 60-story tower in midtown Manhattan sits atop a smaller-scale 10-story base, which creates a street façade t...

| Aug 11, 2010

Mixed-use Seattle high-rise earns LEED Gold

Seattle’s 2201 Westlake development became the city’s first mixed-use and high-rise residential project to earn LEED Gold. Located in Seattle’s South Lake Union neighborhood, the newly completed 450,000-sf complex includes 300,000 sf of Class A office space, 135 luxury condominiums (known as Enso), and 25,000 sf of retail space.

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Brooklyn's tallest building reaches 514 feet

With the Brooklyner now topped off, the 514-foot-high apartment tower is Brooklyn's tallest building. Designed by New York-based Gerner Kronick + Valcarcel Architects and developed by The Clarett Group, the soaring 51-story tower is constructed of cast-in-place concrete and clad with window walls and decorative metal panels.

| Aug 11, 2010

RMJM unveils design details for $1B green development in Turkey

RMJM has unveiled the design for the $1 billion Varyap Meridian development it is master planning in Istanbul, Turkey's Atasehir district, a new residential and business district. Set on a highly visible site that features panoramic views stretching from the Bosporus Strait in the west to the Sea of Marmara to the south, the 372,000-square-meter development includes a 60-story tower, 1,500 resi...

| Aug 11, 2010

'Feebate' program to reward green buildings in Portland, Ore.

Officials in Portland, Ore., have proposed a green building incentive program that would be the first of its kind in the U.S. Under the program, new commercial buildings, 20,000 sf or larger, that meet Oregon's state building code would be assessed a fee by the city of up to $3.46/sf. The fee would be waived for buildings that achieve LEED Silver certification from the U.

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

| Aug 11, 2010

U.S. firm designing massive Taiwan project

MulvannyG2 Architecture is designing one of Taipei, Taiwan's largest urban redevelopment projects. The Bellevue, Wash., firm is working with developer The Global Team Group to create Aquapearl, a mixed-use complex that's part of the Taipei government's "Good Looking Taipei 2010" initiative to spur redevelopment of the city's Songjian District.

| Aug 11, 2010

Recycled Pavers Elevate Rooftop Patio

The new three-story building at 3015 16th Street in Minot, N.D., houses the headquarters of building owner Investors Real Estate Trust (IRET), as well as ground-floor retail space and 71 rental apartments. The 215,000-sf mixed-use building occupies most of the small site, while parking takes up the remainder.

| Aug 11, 2010

Housing America's Heroes 7 Trends in the Design of Homes for the Military

Take a stroll through a new residential housing development at many U.S. military posts, and you'd be hard-pressed to tell it apart from a newer middle-class neighborhood in Anywhere, USA. And that's just the way the service branches want it. The Army, Navy, Air Force, and Marines have all embarked on major housing upgrade programs in the past decade, creating a military housing construction boom.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021