flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Cut Weeks Off The Schedule with Transitions from Armstrong® Ceilings

Cut Weeks Off The Schedule with Transitions from Armstrong® Ceilings


February 22, 2017

Transitions from flush to field or straight and curved elevation changes, drywall and ceiling-to-ceiling transitions are perfect fit and finish. These modular solutions eliminate vertical framing to structure and reduce trade coordination – speeding up installations. Click here to learn more.

Related Stories

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Aug 11, 2010

test

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

5 solutions to acoustic issues in mass timber buildings

For all its advantages, mass timber also has a less-heralded quality: its acoustic challenges. Exposed wood ceilings and floors have led to issues with excessive noise. Mass timber experts offer practical solutions to the top five acoustic issues in mass timber buildings.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021