flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Seattle’s Sound Transit U District Station opens

Transit Facilities

Seattle’s Sound Transit U District Station opens

LMN Architects designed the project in collaboration with McMillen Jacobs Associates.


By David Malone, Managing Editor | October 11, 2021
wayfinding at u district station
Photos: Adam Hunter, LMN Architects

The new 105,000-sf U District Station in Seattle has opened.  The LMN Architects-designed project creates a unified transportation solution and offers a new gateway to the University of Washington campus.

The U District Station is a highly functional, easy-to-use, and appropriately scaled transit hub that is conveniently located for the diverse activities of daily commenting students, workers, and visitors. It is the first stop on the Northgate Link, a 4.3-mile light rail extension from the University of Washington Station on its way north.

The station’s train platform is located 85 feet below street level, with the bulk of the entire 105,000-sf area below grade. Each of the station’s two entrances provides elevators, escalators, and stairs to the trains below. The north entrance lobby serves riders heading to and from the adjacent Neptune Theater and mixed-use neighborhood, as well as a major Metro bus transfer hub on NE 45th Street. The south lobby gives pedestrians a direct link to the UW campus a few blocks east. The sidewalks and streets facing the entrances meet Green Street standards and feature ample landscaping, pedestrian lighting, seat walls, and a bike lane. Both entrance lobbies offer bicycle storage and racks.

U District Station platform

From the north and south lobbies, commuters descend through the escalator and stair tubes to a mid-level open landing that is placed within a tall voluminous central space. From here, they can continue to the train platform below via open escalators and an open stair. The landing appears to float above the angled cross-bracing elements and is offset to the east. This offset, along with artwork and video installation on the west wall, create a design asymmetry that helps to define north-south way finding and directionality on the platform.

The large central volume is defined by a white corrugated metal ceiling and canted walls that conceal essential back-of-house functions. Wayfinding is enhanced by overhead aluminum tubes containing lighting, speakers, and other systems. Two different colors aid passengers in orienting north and south: orange for north and blue for south.

The completed project anticipates record numbers of riders as Seattle’s urban evolution continues.

Related Stories

Transit Facilities | Jan 29, 2021

Virgin Hyperloop unveils its vision for the future of travel

Bjarke Ingels Group has partnered with the company to design the hyperloop portals.

Transit Facilities | Jan 11, 2021

Mukilteo Multimodal Ferry Terminal opens in Mukilteo, Wash.

LMN Architects designed the $187 million project.

Transit Facilities | Jan 5, 2021

New York’s Moynihan Train Hall opens

SOM designed the project.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Transit Facilities | Sep 23, 2019

KAI designs bus transit center for San Antonio’s VIA Metropolitan Transit

The facility takes its design cues from World War I biplanes.

Transit Facilities | Aug 7, 2019

Video: Humphreys & Partners presents its design vision for Uber Air Skyport

In this two-minute video, Walter Hughes, Humphreys' Chief Innovation Officer, walks us through his firm's design concept for Uber's aerial ridesharing hub.

Transit Facilities | Jun 26, 2019

Virgin Trains breaks ground on Orlando passenger rail service expansion

The company is developing 170 miles of new track.

Transit Facilities | Jun 12, 2019

Gensler, Corgan reveal their design concepts for Uber Air Skyports

Eight firms in total revealed concepts for the first fully considered and technically feasible Skyports.

Transit Facilities | May 15, 2019

Damen Avenue at Lake Street transportation facility returns train access to neighborhood

A public art piece created by artist Folayemi Wilson will be just one of the eye-catching features of the new Damen Green Line Station in Chicago.

boombox1 - default
boombox2 -
native1 -

More In Category

Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021