This cube-like, 10-story, 240-foot-tall tower seems to hover over the ground as if it were a sculpture on a pedestal. The Building Team created this floating effect with a cantilevered perimeter consisting of 24 columns, each 42 inches in diameter, supported by a 600-ton truss system nine stories above.
The design-build process facilitated this effort by involving the construction team early in the design phase. For example, those meetings came up with a practical truss scheme inspired by the concentric properties of a wagon wheel.
Consistent owner and Building Team collaboration on this project included a formal partnering program, facilitated by a third-party consultant. Seven full-day workshops were held over the course of the project, at which team members established shared expectations and objectives.
A 600-ton truss system above supports the tower’s cantilevered perimeter, and helped the Building Team create the effect that the cube-shaped building is floating above the ground. Bruce Damonte Photography.
To keep the project on budget without a loss of quality, the Building Team made extensive use of functional mockups to review finishing materials, details, and lighting throughout the facility’s 24 courtrooms and 32 judicial chambers. Other procedures led to innovative value-engineering solutions, such as using soil-cement columns instead of deep foundations.
The owner wanted to reduce the project’s annual energy outcome to 35 kBtu/sf, from the original goal of 47 kBtu/sf. That effort, dubbed “Drive for 35,” led to a six-week brainstorming session. To ensure team members were vested in the outcome, Clark, SOM, Syska, and the major MEP subs agreed to share the risk of payment for this work by tying the goal to contractually guaranteed performance.
Building Team — Submitting firm, general contractor Clark Construction Group–California Owner, developer General Services Administration Architect, structural engineer Skidmore, Owings & Merrill Mechanical/electrical engineer Syska Hennessy Group Plumbing engineer South Coast Engineering Group Construction manager Jacobs
General Information — Size 633,000 sf Cost $343 million Construction time January 2013 to August 2016 Delivery method Design-build
Related Stories
Building Team Awards | Jun 8, 2017
Team win: Clemson University Allen N. Reeves Football Operations Complex
Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.
Building Team Awards | Jun 8, 2017
Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility
Gold Award: A slender building site had direct implications for the design of this light-rail facility.
Building Team Awards | Jun 8, 2017
Missing link: Denver International Airport and Transit Center
Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.
Building Team Awards | Jun 7, 2017
Rising above adversity: National Museum of African American History and Culture
Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.
Building Team Awards | Jun 7, 2017
Blurring the lines: University of Chicago North Residential Commons
Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.
Building Team Awards | Jun 7, 2017
Rebuilding to heal: Sandy Hook Elementary School
Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.
Building Team Awards | Jun 6, 2017
Nerves of steel: 150 North Riverside
Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.
Building Team Awards | Jun 1, 2016
Multifamily tower and office building revitalize Philadelphia cathedral
The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.
Building Team Awards | Jun 1, 2016
Central utility power plant takes center stage at UC San Diego Jacobs Medical Center
An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.
Building Team Awards | May 31, 2016
Gonzaga's new student center is a bustling social hub
Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.