flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

It's back to the future for this contractor

Building Team Awards

It's back to the future for this contractor

Poettker Construction’s new headquarters in rural Breese, Ill., is recognized with a Bronze Award in BD+C’s 2020 Building Team Awards.


By John Caulfield, Senior Editor | November 2, 2020
Poettker Construction's new headquarters

Poettker Construction’s new headquarters brings together internal departments that had been spread over five buildings. Image: Courtesy of Poettker Construction

Anchored in the heart of a small rural community, Poettker Construction’s new headquarters stemmed from a 2016 strategic planning session to grow the company’s brand and retain talent.

The company, which over the previous decade had experienced significant expansion, was looking to bring together internal departments that were spread over five buildings, and to add far more collaborative spaces.

The concept from the project’s design architect Oculus Inc. was a historic German bank barn, which are barns built into a bank or hillside. That idea resonated with Poettker Construction, which served as this project’s owner and design-build leader. Oculus Inc. shared its Revit models to illustrate its vision, and created a 3D virtual reality presentation of the new headquarters to show at the groundbreaking ceremony.

 

The interior design included glassed-enclosed private spaces that allow for intimate collaboration. Image: Joe Dietrich

 

Fitting the building’s height—which boasts a 37-ft-high interior ceiling—within the context of an adjacent residential neighborhood and the architectural style of the traditional bank barn was creatively addressed by working with the topography of the site.

Energy efficiency is a signature feature of this headquarters. The owner’s goal was to reduce the building’s energy consumption by 75% and its carbon footprint by 65%. To abet that goal, the building’s design called for the addition of a solar farm and LED lighting throughout, as well as fluid application of a vapor barrier onto the building’s envelope.

Another key element was a geothermal heating and cooling system, utilizing the lake on premises as well as wells drilled 300 ft deep.

The headquarters’ exterior façade, with steel and glulam structural features, complements the owner’s diverse construction portfolio, and the materials used allowed for unique framing configurations.

 

Steel and glulam are the prominent materials used on the building’s façade. Image; Joe Dietrich

 

The interior design was informed by extensive interviews with management and department heads. The cubicles are tailored to a 21st-century environment with sit-to-stand workstations and open collaboration spaces. Other tech features include an in-house training room that can accommodate seminars, meetings, and learning opportunities for up to 100 people. Connections to facilitate internal and external interactions among departments and clients made working at home easier during the coronavirus pandemic.

The design had to address privacy concerns for departments like accounting and human resources, which are now hosted on the building’s mezzanine level next to Poettker’s executive offices. The mezzanine overlooks the company’s operations department, so the designers installed acoustical ceiling clouds above the accounting department to dampen the sound transfer between levels.

 

A large lobby and reception area lead to stairs that connect the building’s two work areas. Image: Alise O'Brien

 

On-site health and wellness amenities include a 24-7 private fitness center for staff, and a 3.5-acre outdoor sanctuary with a lake, waterfall, and landscaping that lead to a walking path.

The headquarters, which opened in October 2019, hosts events to engage and interest people of all ages in the construction industry. Last year, over 200 college and high school students took part in workforce and informational tours of the building.

 

The headquarters premises include an outdoor sanctuary with a lake, fountains, and walking paths. Image: Joe Dietrich

 

Submitting firm, Architect and Project manager: Oculus Inc.
Owner/developer and GC/CM: Poettker Construction
Structural Engineer: IMEG Corp.
MEP Engineer: BRiC Partnership
Size: 39,400 sf
Construction time: July 2018 to September 2019
Cost: NA
Delivery method: Design/Build
Photo credit: Alise O’Brien Photography

Related Stories

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Building Team Awards | Jun 13, 2017

Government campus reimagined: Intelligence Community Campus

Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Building Team Awards | Jun 12, 2017

Circles and squares: Faena Arts Center

Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Building Team Awards | Jun 8, 2017

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.

Building Team Awards | Jun 8, 2017

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.

Building Team Awards | Jun 8, 2017

Team win: Clemson University Allen N. Reeves Football Operations Complex

Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021