flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

IPD-driven fusion facility serves science and student life in Chicago

Building Team Awards

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.


By David Barista, Editorial Director | April 9, 2015
Ipd-driven fusion facility serves science and student life in Chicago

Among the building’s student life functions is a bistro-style cafe and lounge with views of the central campus green. Photos: Mark Ballogg

This article first appeared in the April 2015 issue of BD+C.

Situated in the heart of North Park University’s urban campus on Chicago’s North Side, the Johnson Center for Science and Community Life provides state-of-the-art science laboratories and classrooms, and aggregates the university’s student-serving functions. The building strengthens NPU’s strong position in the sciences—namely, biology, chemistry, math, physics, and psychology—and enhances its competitive edge by replacing outdated facilities with modern, technologically advanced spaces.

Through visioning and charrette sessions with the science faculty, student development administration, and students, a Building Team led by The Boldt Company, VOA Associates, and W.B. Olson created a striking masonry-and-glass academic science building that effectively marries academic functions with community life spaces. 

The L-shaped facility is divided into two wings—one for classrooms, the other for laboratory spaces—which are linked via a two-story, glass-clad lobby that houses lounges, meeting rooms, a bistro-style food venue, and faculty and administration offices. Lounges and offices are also sprinkled throughout the two academic wings to encourage commingling of students and faculty. 

Taking design cues from the masonry and stone exteriors of NPU’s existing campus buildings—especially its 1890s-era Old Main—the design team clad the structure in a terra cotta rainscreen above a stone-clad base. Ribbon windows, shielded by sunscreens, admit generous amounts of daylight into the classrooms, labs, and lounges. The building opens onto a spacious campus green, inviting campusgoers into its shimmering glass box entrance. 

PROJECT SUMMARY
GOLD AWARD
Nancy and G. Timothy Johnson Center for Science and Community Life, North Park University
Chicago, Ill.

BUILDING TEAM
Submitting firm: VOA Associates (architect)
Owner: North Park University
Owner’s representative: The Boldt Company
Structural engineer: Sound Structures
Mechanical/plumbing engineers: Primera Engineers, Hill Mechanical
Electrical engineers: Primera Engineers, Jamerson and Bauwens Electrical
Construction manager: W.B. Olson

GENERAL INFORMATION
Project size: 101,000 sf
Construction cost: $36 million
Construction period: January 2013 to September 2014
Delivery method: Tri-party IPD (owner, architect, CM)

IPD COMES TO CAMPUS   

In a rare move for higher education projects, VOA, W.B. Olson, and NPU/Boldt performed all work under a three-party integrated project delivery agreement. The IPD contract included a project target cost estimate and risk pool to hold all core team members accountable and to ensure the project would be completed on time and within budget. The core team met weekly to work through unforeseen issues, and held periodic “big room” meetings with key subcontractors: building enclosure, MEP systems, IT, audio/visual, and laboratory casework.

This culture of collaboration enabled the Building Team to overcome numerous obstacles without impacting the budget or schedule. When design work was well under way, the client requested that lecture-capture technology (the ability to record lectures for playback at other locations/times) be added to the program. The team was able to accommodate the systems, as well as the acoustical provisions for lecture-capture classrooms—sound attenuators, vibration isolation, and larger ductwork—without impacting the overall project goals. 

The team delivered the building at $360/sf, $50,000 under the original budget. There were zero claims on the project, and the building was completely closed out within three months of occupancy. 

“I doubt this kind of cost-effective solution would have emerged under a design-bid-build approach,” said Carl E. Balsam, North Park’s EVP/CFO. “The core team was able to come up with the appropriate solutions and still stay within budget. Collaborative problem solving saved the day.”

Note: VOA’s Susan Heinking, a member of the awards jury, recused herself from this project.

 

Flexible research stations and retractable partitions with writable surfaces promote interaction and collaboration between students and faculty.

 

The double-wing building opens onto the campus green, inviting campus goers into its shimmering glass box entrance.

Related Stories

Giants 400 | Aug 11, 2021

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400

Building Team Awards | Mar 12, 2021

2021 Building Team Awards Entry Information

Only new construction projects completed on or after January 1, 2020 are eligible. Deadline for submissions: May 14, 2021.

Building Team Awards | Mar 12, 2021

Deadline extended for the 2021 Building Team Awards

BD+C's Building Team Awards is the industry's only recognition program to honor projects that achieve excellence in both design/construction and collaboration of the AEC/O team. Deadline for entries: May 14, 2021.

Building Team Awards | Nov 4, 2020

12 projects earn BD+C's 2020 Building Team Awards

The Statue of Liberty Museum, Allianz Field, and the Long Beach Civic Center are three of the projects awarded with BD+C's 2020 Building Team Awards.

Building Team Awards | Nov 3, 2020

Birmingham's haven for the homeless

A coalition of ministries raised millions to build a new home for homeless men in Alabama’s largest city. The Firehouse Shelter wins Honorable Mention in the 2020 Building Team Awards.

Building Team Awards | Nov 2, 2020

It's back to the future for this contractor

Poettker Construction’s new headquarters in rural Breese, Ill., is recognized with a Bronze Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Nov 2, 2020

Long Beach gets a municipal marvel

The Long Beach Civic Center is honored with a Bronze Award in the 2020 Building Team Awards.  

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021