flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Data centers keep cool while staying hot-hot-hot

Data Centers

Data centers keep cool while staying hot-hot-hot

Cooling mission critical facilities efficiently is critical to their operations and profitability.


By John Caulfield, Senior Editor | July 25, 2018
Data centers keep cool while staying hot-hot-hot

The $28 million data center at St Jude’s Children's Research Hospital, Memphis. The project team for the three-story, 55,000-sf facility: Gensler (architect), Paradigm Structural Engineers (SE), Syska Hennessy Group (ME), Liles Energy Design Consultants (EE), Jensen Hughes (fire/life safety), and Flintco Inc. (GC). Photo: Joe Luther

Last January, Bcause LLC brought online a $65 million data center in Virginia Beach, Va., whose sole purpose is to mine Bitcoin. This is the largest cryptocurrency data center in North America. Bcause chose this location to serve Northern Virginia, the largest data center market in the U.S.

Last year, the U.S., Canada, Europe, and Asia Pacific absorbed 583.5 MW of new data center capacity. At least 400 MW more is under construction, according to JLL.

Over the past five years, data center construction has outpaced all other real estate categories, according to Site Selection Group. AEC firms active in the sector are enjoying the ride. Last year, the top five contractors in the sector put $4.4 billion worth of mission-critical facilities in place.

Ben Kaplan, SVP/GM of Turner Construction’s Global Critical Facilities Group, says demand for colocation data centers “remains quite strong,” even among cloud service providers that are building their own facilities. ("Colos" are data centers that rent server space to multiple entities.)

 

See also: Top 40 Data Center Architecture + AE Firms - 2018 Giants 300 rankings
See also: Top 55 Data Center Engineering + EA Firms - 2018 Giants 300 rankings
See also: Top 45 Data Center Contractors + CM Firms - 2018 Giants 300 rankings

 

One of Turner’s recent data centers, for colo/hybrid services provider QTS, is Project Joshua, a 445,000-sf greenfield building in Ashburn, Va., with 32 MW capacity, 180,000 sf in raised floor space, 60,000 sf of office and storage space, and reinforced walls that can withstand 125-mph winds.

 

One case where size really matters

Mega-facilities that exceed one million sf and 100 MW in capacity are impacting what’s getting built and where. Site Selection Group says seven of the biggest 13 centers under construction exceed a million square feet. In Huawei, China, a 4.3-million-sf data center is under construction.

Data center operator Raging Wire is building a 42-acre campus in Garland, Texas, that will house five buildings totaling one million sf and 80 MW of IT load. The first phase (201,000 sf, 16 MW), known as TX-1, was completed in June 2017. Page is providing master planning, architecture, MEP/FP design, interiors, and LEED consulting on the project.

John Major, AIA, Page’s Principal for Science & Technology, says the Raging Wire facility is unique in that its amenities are located at the center of the building. “Data centers aren’t typically workplaces,” he says. TX-1 incorporates Class A office space and hospitality-themed amenities to differentiate it from competitors and encourage prospective tenants to station dedicated teams at the facility.

Major says clients' approach to building mega–data centers seem to be shifting. While large campuses are certainly being developed, “the tranches of deployment have been scaled down dramatically to facilitate faster speed-to-market and lower first-tranche cost,” he says.

Speed-to-market and capital cost advantages have made constructing single-tenant data centers via third-party developers an “increasingly popular delivery model” for large technology users in cloud services and media offerings, note Gensler's Vaughn Lamar, LEED AP, Senior Associate and Project Architect, and Jackson Metcalf, LEED AP, Associate and Technical Designer.

Among such projects is Gensler’s work for St. Jude’s Children’s Research Hospital, Memphis, Tenn., which consolidated operations of three buildings. A new fiber ring around the campus provides faster service and better connectivity.

 

Controlling water use for cooling

Reliability, especially as a hedge against natural disasters, is paramount to any data center’s operations. The BBVA Technology Center, Atizapan, Mexico, provides critical IT support for the bank’s worldwide operations. Its location—on high ground at the edge of Mexico City, an active earthquake region—made it imperative that this 31,025-sm facility be designed to the highest levels of safety and redundancy.

Skidmore, Owings & Merrill, lead designer on this Tier IV data center, protected the building from seismic events through progressive collapse design strategies and a foundation isolator beneath the building, explains Kim Van Holsbeke, Associate Director in SOM’s New York office.

Data center operators are also paying close attention to the environmental impact of their facilities.

“Right now, the big trend is water,” says Robert Ioanna, PE, LEED AP, Senior Principal, Syska Hennessy Group. Newer data centers are turning to cooling systems that run on little or even no water.

For a recent 300,000-sf, 30 MW data center in Mexico, Syska Hennessy was going to go with water cooling, only to have the property owner revoke the client’s water-use privileges. Syska redesigned the mechanical and electrical systems to operate without water, using air-cooled chillers with integrated economizer cycles.

Page's Major foresees more liquefied immersion cooling, where servers get submerged in thermally conducted dielectric liquid. This method typically doesn’t require fans and allows the data center to run at hotter temperatures.

  

Related Stories

Data Centers | Feb 28, 2024

What’s next for data center design in 2024

Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED. 

Data Centers | Feb 1, 2024

Gen AI will drive data center growth, says latest JLL sector report

Power access is pushing developers toward alternative sources and secondary markets.

Data Centers | Nov 22, 2023

How is artificial intelligence impacting data center design?

As AI is reshaping how we interact with machines and the world around us, the design of data centers needs to adapt to this fast-changing landscape. So, Page pairs expert thinking with high-performing solutions to meet the needs of rapidly advancing technologies.

Data Centers | Nov 13, 2023

Data center sector trends for 2023-2024

Demand for more data centers is soaring, but delivery can be stymied by supply delays, manpower shortages, and NIMBYism.

Giants 400 | Oct 2, 2023

Top 50 Data Center Construction Firms for 2023

Turner Construction, Holder Construction, HITT Contracting, DPR Construction, and Fortis Construction top BD+C's ranking of the nation's largest data center sector contractors and construction management firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Oct 2, 2023

Top 60 Data Center Engineering Firms for 2023

Jacobs, Burns & McDonnell, WSP, EXP, and Alfa Tech head BD+C's ranking of the nation's largest data center sector engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Oct 2, 2023

Top 30 Data Center Architecture Firms for 2023

Corgan, HDR, Gensler, Page Southerland Page, and HED top BD+C's ranking of the nation's largest data center sector architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Data Centers | Sep 21, 2023

North American data center construction rises 25% to record high in first half of 2023, driven by growth of artificial intelligence

CBRE’s latest North American Data Center Trends Report found there is 2,287.6 megawatts (MW) of data center supply currently under construction in primary markets, reaching a new all-time high with more than 70% already preleased. 

Data Centers | Sep 15, 2023

Power constraints are restricting data center market growth

There is record global demand for new data centers, but availability of power is hampering market growth. That’s one of the key findings from a new CBRE report: Global Data Center Trends 2023.

Giants 400 | Aug 22, 2023

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category

Data Centers

What’s next for data center design in 2024

Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021