flexiblefullpage -
interstitial1 - interstitial
Currently Reading

Campus builder: Everett University Center at Washington State University

Building Team Awards

Campus builder: Everett University Center at Washington State University

Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.


By David Barista, Editorial Director | May 21, 2018

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. Benjamin Benschneider Photography.

As the anchor building of a new branch campus for Washington State University, the 95,000-sf Everett University Center plays a crucial role in providing STEM-based baccalaureate and graduate programs to the North Puget Sound region. Previously, this area had been underserved by higher education opportunities for low- and middle-income families. The facility is the inaugural building of a master-planned campus.

The EUC is designed to engage students, local businesses, and the community. The four-story atrium serves as an interior street and is fronted by key student support elements with multiple “storefronts” for student services, a tiered lecture hall, classroom, and the Capstone Studio, an upper-division lab providing students and industry partners a place for invention and innovation. Large bifold doors in the lab spaces open to a paved outdoor workspace for lab work, demonstrations, and community participation.

 

 

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. The wood stair structure is made of 5/8-inch-thick lamella, custom bent and glued to create sinuous full-length spans for the stringers spanning up to 44 feet.

Green features in this LEED Gold-registered building are on display throughout. The photovoltaic panels are showcased along the roofline on the southern façade. Supported by a cantilevered steel subframe, the PVs extend 10 feet beyond the face of the building, as a modern interpretation of a cornice. A dashboard in the lobby displays real-time PV productivity and the building’s energy consumption.

The atrium is naturally cooled and ventilated with mechanically operable windows and louvers. During winter months, heat energy is harvested from the building’s data center and reused in the atrium’s hydronic radiant floor. Rainwater is captured in a below-grade cistern and repurposed for toilet flushing and irrigation.

 

 

Building Team — Submitting firm, architect SRG Partnership Owner Washington State University Structural engineer KPFF Consulting Engineers MEP engineer McKinstry General contractor Hoffman Construction

General Information — Size 95,000 sf Construction cost $64.6 million Construction time July 2015 to May 2017 Delivery method Design-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | May 22, 2018

LA's game changer: Wilshire Grand Center

Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.

Building Team Awards | May 21, 2018

Promise fulfilled: Park West, Texas A&M University

Silver Award: A P3-driven team completes this mega off-campus student housing complex ahead of its fast-track schedule.

Building Team Awards | May 18, 2018

Prognosis: Positive: Rutgers University-Camden Nursing and Science Building

Gold Award: Can a new nursing school breathe life into America’s third-poorest city?

Building Team Awards | May 17, 2018

Patient priorities: Cleveland Clinic Taussig Cancer Center

Gold Award: Cleveland Clinic’s new cancer center is a transparent, collaborative hub for improved patient experiences and enhanced communication with caregivers.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Building Team Awards | May 15, 2018

High court, big impact: San Diego Central Courthouse

Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.

Building Team Awards | May 14, 2018

Sweat equity marks landscaping effort

The design was grounded in therapeutic landscape and environmental psychology theory.

Building Team Awards | May 14, 2018

Rethinking prison design: Iowa Correctional Institution for Women

Platinum Award: Iowa's new women's correctional institution offers a revolutionary model for rehabilitating female inmates.

Building Team Awards | May 14, 2018

Dream delivered: McCormick Square Marriott Marquis and Wintrust Arena

Platinum Award: A daring hotel and sports development in Chicago’s South Loop aims to invigorate the city’s convention business.

Building Team Awards | Jun 14, 2017

17 projects earn BD+C's 2017 Building Team Awards

Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021