flexiblefullpage -
interstitial1 - interstitial
Currently Reading

Campus builder: Everett University Center at Washington State University

Building Team Awards

Campus builder: Everett University Center at Washington State University

Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.


By David Barista, Editorial Director | May 21, 2018

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. Benjamin Benschneider Photography.

As the anchor building of a new branch campus for Washington State University, the 95,000-sf Everett University Center plays a crucial role in providing STEM-based baccalaureate and graduate programs to the North Puget Sound region. Previously, this area had been underserved by higher education opportunities for low- and middle-income families. The facility is the inaugural building of a master-planned campus.

The EUC is designed to engage students, local businesses, and the community. The four-story atrium serves as an interior street and is fronted by key student support elements with multiple “storefronts” for student services, a tiered lecture hall, classroom, and the Capstone Studio, an upper-division lab providing students and industry partners a place for invention and innovation. Large bifold doors in the lab spaces open to a paved outdoor workspace for lab work, demonstrations, and community participation.

 

 

The atrium is adorned with a striking cantilevered Douglas Fir staircase as a nod to the storied history of the Pacific Northwest timber industry and a statement of modern engineering. The wood stair structure is made of 5/8-inch-thick lamella, custom bent and glued to create sinuous full-length spans for the stringers spanning up to 44 feet.

Green features in this LEED Gold-registered building are on display throughout. The photovoltaic panels are showcased along the roofline on the southern façade. Supported by a cantilevered steel subframe, the PVs extend 10 feet beyond the face of the building, as a modern interpretation of a cornice. A dashboard in the lobby displays real-time PV productivity and the building’s energy consumption.

The atrium is naturally cooled and ventilated with mechanically operable windows and louvers. During winter months, heat energy is harvested from the building’s data center and reused in the atrium’s hydronic radiant floor. Rainwater is captured in a below-grade cistern and repurposed for toilet flushing and irrigation.

 

 

Building Team — Submitting firm, architect SRG Partnership Owner Washington State University Structural engineer KPFF Consulting Engineers MEP engineer McKinstry General contractor Hoffman Construction

General Information — Size 95,000 sf Construction cost $64.6 million Construction time July 2015 to May 2017 Delivery method Design-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | Jun 24, 2019

14 projects earn BD+C's 2019 Building Team Awards

The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.

Building Team Awards | Jun 21, 2019

Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel

Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.

Building Team Awards | Jun 20, 2019

PPP gets the job done: Three-party deal saves time and money for client

Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.

Building Team Awards | Jun 20, 2019

Making waves: The façade of Pacific Visions suggests the movement of water, day and night

Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.

Building Team Awards | Jun 19, 2019

Unsung heroes: Two hurricanes couldn't stop this project team

Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.

Building Team Awards | Jun 19, 2019

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Silver Award: The 158,000-sf addition collocates three crime-fighting functions.

Building Team Awards | Jun 18, 2019

Eyesore no more: People come together to expand a much-needed daycare center

Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.

Building Team Awards | Jun 17, 2019

Campus renewal: Community effort saves a crucial healthcare resource

Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).

Building Team Awards | Jun 13, 2019

In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown

Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021