flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

BIG and HOK’s winning design for Zurich airport’s new terminal

Airports

BIG and HOK’s winning design for Zurich airport’s new terminal

The mass timber design pays homage to Switzerland’s iconic mountains and pitched roofs.


By Novid Parsi, Contributing Editor | June 29, 2022
Zurich Airport Dock A ext 1
Selected from 10 global competition entries, the winning proposal for the largest dock of the internationally acclaimed Zurich airport is comprised predominantly of solid regional wood. Courtesy BIG.

Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock. The winning design is led by BIG, with HOK as the aviation architect. The new Dock A—including gates, retail, lounges, offices, a new air traffic control tower, and an extension of the immigration hall—is slated to open by 2032.

The seven-floor Dock A will have two main areas: a central hub with shopping, airport services for arriving and departing passengers, and vertical circulation; and a pier with the gates, waiting areas, and fixed links connecting to the planes. The control tower will be placed in the building’s center.

Dock A’s structure, floors, and ceilings will be made primarily with mass timber. A renewable local resource, this material will allow for prefabrication during the construction process—while also nodding to the Swiss tradition of wood construction. The building’s V-shaped timber columns not only provide structural support but also reference Switzerland’s iconic mountains and pitched roofs.

“As airports grow and evolve and as international guidelines and safety requirements change, airports tend to become more and more complex: Frankensteins of interconnected elements, patches and extensions,” Bjarke Ingels, founder and creative director, BIG, said in a statement. “For the new main terminal of Zurich Airport, we have attempted to answer this complex challenge with the simplest possible response: a mass timber space frame that is structural design, spatial experience, architectural finish, and organizational principle in one.”

The long, sculptural roof will be covered with PV panels. Integrated shading will reduce solar heat gain and maintenance requirements. And the building will use a combination of water and air-based cooling and heating systems.

The “simple yet expressive design,” Ingels added, embodies “the cultural and natural elements of Swiss architecture.”

On the building team:
Owner: Zurich Airport
Design lead: BIG
Aviation architect: HOK
Local architect: 10:8
Structural engineer: Buro Happold
Structural engineer timber/building physics: Pirmin Jung Schweiz AG
Mechanical engineer: Haerter & Partner AG
Electrical engineer: TLP
Construction management: Baurealisation

Zurich Airport daylighting system
To enhance the passenger experience, the spaces within the new terminal use daylight as a natural wayfinding system. Courtesy BIG.
Zurich AIrport Dock A int
A contemporary, pared-back material palette, the structure, floors, and ceilings of Dock A are envisioned with timber as the main material. Courtesy BIG.
Dock A roof PV Panels
Dock A’s roof will be covered with PV panels while integrated shading will reduce solar heat gain and maintenance requirements, and a combination of water and air-based cooling and heating systems will improve the building’s energy demand. Courtesy BIG.

 

Related Stories

Airports | Jul 7, 2022

Love at first flight: The power of first impressions in airports

As architects, how we design a terminal and choreograph the passenger experience can stir up strong feelings.

Airports | Jun 2, 2022

SOM-designed International Arrival Facility at Seattle’s Sea–Tac airport features the world’s largest aerial walkway

The Skidmore, Owings & Merrill (SOM)-designed International Arrivals Facility (IAF) at Seattle-Tacoma International Airport has opened, replacing a 50-year-old arrival facility.   

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Airports | Apr 4, 2022

Dominican Republic airport expansion will add mixed-use features

The recently revealed design concept for the expansion of Santiago International Airport in the Dominican Republic includes a transformation of the current building into a mixed-use space that features an office park, business center, and hotel.

Codes and Standards | Mar 4, 2022

FAA offers $1 billion in grants for airport terminal and tower projects

The Federal Aviation Administration (FAA) is now accepting applications for about $1 billion in grants for airport projects during fiscal year 2022.

Resiliency | Feb 15, 2022

Design strategies for resilient buildings

LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design. 

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

Giants 400 | Oct 22, 2021

2021 Airport Sector Giants: Top architecture, engineering, and construction firms in the U.S. airport facilities sector

AECOM, Hensel Phelps, PGAL, and Gensler top BD+C's rankings of the nation's largest airport sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

| Oct 14, 2021

The future of mass timber construction, with Swinerton's Timberlab

In this exclusive for HorizonTV, BD+C's John Caulfield sat down with three Timberlab leaders to discuss the launch of the firm and what factors will lead to greater mass timber demand.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021