Once upon a time the 111-year-old Nockege River Mill Building, located on the banks of the Nashua River near Fitchburg, Mass., spun yarn. Now, its long ago purpose lends itself to a new moniker: Yarn Works.
Yarn Works is a mixed-income, adaptive-reuse community of 96 rental units, 40% of which are reserved for low- or middle-income individuals and families.
The original mill was designed by F. P. Sheldon & Son and built in just five months. The Architectural Team (architect) combined a mix of renovation, preservation, and new interventions: repointing the entire brick envelope, replacing almost 300 8x12-foot windows, and raising the entire first floor above a 100-year floodplain.
The structure required extensive reinforcement to supplement the existing granite footings. Instead of building a new foundation, general contractor Colantonio, Inc., added small stub columns supported by the original granite. Steel beams replaced collapsing interior wooden ceiling trusses, adding crucial reinforcement while maintaining the mill’s historic character.
The masonry façade was retained according to methods approved by various state and federal renovation standards. Two million bricks were cleaned and repaired as needed. The mortar composition was analyzed to match the original. A custom steel entry that acknowledged the character of cast-iron and steel beams used throughout the original structure was constructed.
All 57 market-rate and 39 affordable oversized loft homes offer bountiful natural light, wood-plank ceilings and floors, exposed brick and original beams, and ceiling heights up to 15 feet. A 3,000-sf community room, media area, fitness and yoga center, on-site bike storage, and green space round out the lifestyle amenities.
Photo: © Andy Ryan.
Silver Award Winner
BUILDING TEAM The Architectural Team (submitting firm, architect) Ideal Design (interior architect) Odeh Engineers (SE) Colantonio (GC) DETAILS 182,500 sf Total cost $24.2 million Construction time January 2016 to September 2017 Delivery method Design-bid-build
CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE
Related Stories
Reconstruction Awards | Nov 26, 2019
Sweetest sounds: Metropolitan Opera House
An early 20th-century opera house now hosts concerts from Disney Acapella to Weezer.
Reconstruction Awards | Nov 25, 2019
The University of Chicago Harris School at the Keller Center
Project team goes all out for LEED Platinum and the Living Building Challenge.
Reconstruction Awards | Nov 22, 2019
Let there be light: Union Station Great Hall
What’s the cure for a leaky skylight? Another skylight built above it, of course.
Reconstruction Awards | Nov 21, 2019
Temporary quarters: Senate of Canada Building
Canada’s Senate gets an interim home in what was once the capital’s main train station.
Reconstruction Awards | Nov 19, 2019
Springfield Technical Community College: Goodbye to 'the shuffle'
College unites student services under one roof.
Reconstruction Awards | Nov 18, 2019
The Paint Factory: Not just a new coat of paint
An enlightened A/E firm is spurring redevelopment in an old industrial section of Little Rock.
Reconstruction Awards | Nov 15, 2019
Back on track: Union Terminal renovation and restoration
Painstaking care went into restoring Cincinnati’s train terminal/museum complex.
Reconstruction Awards | Nov 14, 2019
Museum at the Gateway Arch: Subterranean sensation
The project team used its creativity to overcome floods and other obstacles to construction.
Reconstruction Awards | Nov 13, 2019
Zachry Engineering Education Complex: Rethinking engineering education
Texas A&M’s engineering school builds for future growth.
Reconstruction Awards | Nov 12, 2019
Linode Headquarters: High-tech + historic
New headquarters mixes old and new to help this fast-growth company attract top talent.