The Willis Tower is in the midst of a massive renovation project to update the iconic skyscraper. As part of that project, the building’s 83 elevators and 97 passenger cabs, including their respective machine rooms, motors, cables, and controls, will be updated by Otis.
The Willis Tower elevator system makes over 46,000 daily trips and serves about 5.8 million people each year (over 15,000 per day). The modernization project will reduce travel time during peak hours by up to 30% and cut energy costs by an estimated 35%.
See Also: $500 million investment will modernize Chicago’s Willis Tower
Otis and Equity Office finalized a contract to upgrade the building’s elevator cabs to Otis SkyRise units using the CompassPlus destination management system. The CompassPlus system organizes traffic flow and sorts passengers into each elevator based on their destinations to get people where they are going faster than conventional dispatching systems.
The upgrades on the elevators will begin in June. As part of the contract, Otis will provide maintenance service for the elevators for 10 years.
Related Stories
| Jan 3, 2012
28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients
A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.
| Jan 3, 2012
Rental Renaissance, The Rebirth of the Apartment Market
Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 27, 2011
Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola
Topping off ceremony held on 238th Anniversary of Boston Tea Party.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 19, 2011
Summit Design+Build selected as GC for Chicago recon project
The 130,000 square foot building is being completely renovated.