flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Two buildings or three?

Sponsored Content Metals

Two buildings or three?

The exterior of the Trane office has a dramatic look.


By Star Building Systems | January 5, 2018

TJK Design Build, Inc. of Madison, WI is a company that prides itself on innovative design and outside-the-box approaches to architectural challenges. They frequently build with Star Buildings – often in situations where a metal building is not the usual choice – because TJK has learned that Star is willing to turn their unusual ideas into reality.

The Trane sales office in Madison, WI is a good example. The entire building has a footprint slightly over 10,000 sf. There was no requirement for the kind of broad clear-span area that often drives the decision to use a metal building system. In fact, the modest overall size is actually divided into three sections, and structurally framed as three metal building systems joined together.

According to TJK president Tim Kritter, they chose to make this project a Star metal building for three reasons: cost effectiveness, speed of construction (specifically in relation to the onset of winter), and a flexibility of design afforded by working with Star, which Kritter describes as rare in the industry.

 

 

The layout of the building consists of a low-roofed central section with two taller ‘wing’ buildings on either side. (The rising rooflines of the two sides make that term seem more-than-usually appropriate.) The west wing is largely composed of smaller private offices for the sales force. The east wing is a large, open bullpen-type office. The center has the conference room, break room, other common space, and mechanical rooms. Trane HVAC units on the roof of the center section serve all three parts of the building.

The exterior of the Trane office has a dramatic look. The soaring roofs are extended into projection canopies – overhangs five feet long around the sides and 2 feet long at the roof peaks – that help shield the many windows from direct sun. Tim Kritter points out that the aesthetic contribution of overhangs was just as important to the project as solar shading. “They create shadow lines, and give it significant interest.”   

The two side-buildings are clad in two colors of AVP 26 ga. metal wall panels, Medium Bronze and Colonial Red. The center section’s exterior is dominated by glazing, surrounded by Trespa panels in colors matching the AVP panels.

 

 

If the look of the Trane office is innovative, the structural system that achieves it is probably even more unusual. It could be considered as structurally three buildings, if you look at the rafters. However, it is supported on the number of columns you would expect for two buildings. The center section’s rafters have no columns of their own. They piggyback onto the inner columns of the two wings, supported by means of brackets welded onto the columns. This unusual approach saved on steel and erection time. 

Kritter also emphasizes that by using a metal building, they were able to meet a significant challenge in timing. Site work and concrete foundations were begun in October, enabling them to complete concreting before freezing conditions became an issue. This allowed them to have the metal structural frame delivered and erected in December. Because they were able to enclose the building early in the winter, they could work indoors through the rest of the winter to finish the project.  

 

 

Kritter is enthusiastic about using metal building systems from Star, and reports that it works out advantageously for his company and his customers, even on small projects. 

“Star works very, very well with us, allowing us to create these unique shapes and uses, and create enough architectural interest to use a metal building,” comments Kritter. “There are a lot of pre-engineered building manufacturers out there, but we like the ease of creating ideas using Star’s design software. Some metal building manufacturers are just dinosaurs, but Star is willing to allow us to design our building and incorporate elements of architecture back into their system. They’re so good at that, it’s one of the reasons we continue to work with Star.”

Tags

Related Stories

Sponsored | Roofing | Mar 21, 2017

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 

Products and Materials | Mar 16, 2017

Product roundup: 12 metal roofing and wall products

Tapered Series panels from Dri-Design, Retro-R Panels from MBCI, and Formawall from Centria are just three of the 12 products highlighted in BD+C's February Product Roundup.

Sponsored | Metals | Mar 13, 2017

The art of the metal building system

When Knox College was in need of more space for arts education, they turned to a metal building system solution. 

Sponsored | Steel Buildings | Jan 24, 2017

Engineered for strength

Sponsored | Metals | Dec 5, 2016

Harrison Commons: The beauty of revitalization

The mixed use Harrison Commons project is an early and essential step toward revitalizing a neglected area.

Sponsored | Metals | Dec 1, 2016

The evolution of codes

Today’s codes define more efficient, effective structures, but the engineering of them has become vastly more complex.

Sponsored | Metals | Nov 21, 2016

Ready for earthquakes?

There is a mistaken belief among some people that steel buildings do not do well in earthquakes. The truth is quite the opposite.

Sponsored | Metals | Oct 19, 2016

New village hall boasts contemporary look, LEED Gold status

The building design was inspired by historical elements in the community, and utilizes traditional masonry construction highlighted with a contemporary PAC-CLAD standing seam metal roof.

Sponsored | Metals | Oct 17, 2016

A tornado that couldn't destroy

Sponsored | Cladding and Facade Systems | Sep 15, 2016

Healing has a new home: Parkland Hospital

ALPOLIC® materials contribute to a life-affirming experience.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021