flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

San Diego Chargers announce plan for downtown stadium and convention center

Sports and Recreational Facilities

San Diego Chargers announce plan for downtown stadium and convention center

The project will be funded primarily by a tax increase on hotel stays.


By Mike Chamernik, Associate Editor | April 1, 2016
San Diego Chargers announce plan for downtown stadium and convention center

Qualcomm Stadium, the San Diego Chargers' current home. Photo: SD Dirk/Creative Commons

The San Diego Chargers released a 110-page report regarding details of a $1.8 billion plan for a new football stadium and convention center in downtown San Diego.

The stadium and convention center will be funded by a 4% tax increase on hotel stays. The San Diego Union-Tribune reports that the proposed hotel tax rate, 16.5%, will be one of the country’s highest. 

But the rate will spare taxpayers of a large financial burden. Funding will come from the hotel tax increase and $650 million from the Chargers and the NFL.

The Chargers will sign a 30-year lease and a non-relocation agreement, and they will be responsible for any construction cost overruns and future stadium improvements.

The new report is the first step toward gaining 70,000 signatures by June so that the plan can be included on California ballots this November. 

A final architectural plan has not been determined. Options include building the convention center either underneath or next to the stadium. Dubbed the "convadium," it will be built near Petco Park, where the San Diego Padres of MLB play.

Qualcomm Stadium, the Chargers' current 70,000-seat home, was built in 1967 and is the NFL’s fifth-oldest stadium. The team desires a new home, either in San Diego or elsewhere.

Los Angeles has been a possibility for the last several years. This winter, the NFL approved the St. Louis Rams’ proposal for a new $3 billion stadium in Inglewood (just outside of L.A.), and the league rejected a joint stadium venture in the city for the Chargers and Oakland Raiders. The Chargers have a year to decide whether they want to move to Los Angeles and share a stadium with the Rams.

Related Stories

Giants 400 | Oct 22, 2021

2021 Sports Facilities Giants: Top architecture, engineering, and construction firms in the U.S. sports and recreation facility sector

AECOM, Populous, Kimley-Horn, and HOK top BD+C's rankings of the nation's largest sports and recreation facility sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Arenas | Sep 20, 2021

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.

Sports and Recreational Facilities | Sep 15, 2021

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Aug 25, 2021

The rise of entertainment districts and the inside-out stadium

Fiserv Forum, home to the 2021 NBA Champion Milwaukee Bucks, proved that the design of the space outside a stadium is just as important as inside.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Sports and Recreational Facilities | Aug 18, 2021

Populous’ design takes center stage for MLB’s Field of Dreams game

The movie-inspired ballpark is located in Dyersville, Iowa.

Sports and Recreational Facilities | Aug 5, 2021

Austin FC’s Q2 Stadium completes

Gensler designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021