The San Antonio Spurs kicked off the current NBA season with a new practice facility that aims not only to help players win championships but also to promote their physical and mental well-being.
Designed by ZGF, the Victory Capital Performance Center uses biophilic design to promote better health and wellness on and off the court for players who spend much of their time indoors. The facility provides training, meeting, dining, and event spaces, while also offering outdoor experiences, indoor/outdoor spaces, and ample natural lighting.
The new 138,900-sf center includes practice courts; locker rooms; athletic training and performance areas; strength and conditioning spaces; recovery spaces, including hydrotherapy pools, sauna, steam room, and float tanks; kitchen and dining spaces; meeting and event spaces; outdoor training area; secure parking; workspace with offices and conference rooms for coaches, administration, and training staff; and a potential broadcast center.
The center also is billed as the largest mass timber constructed training center in professional sports. The design features cross-laminated timber, glulam beams, and concrete masonry units.
With masonry, glass, and wood, the design drew inspiration from the vernacular and landscape of the San Antonio region, particularly its Mission-style architecture, subtropical landscape, and San Antonio River Walk. Local limestone, knotty oak, and leathers nod to the local architecture.
While the front of the facility houses the practice courts and training spaces, the back includes smaller-scale spaces for privacy, gathering, and recovery. A public façade features board-formed concrete and glass fiber reinforced concrete piers that form a colonnade to display champion banners and guide visitors to the glass-box entry lobby.
Further into the space, the design becomes more intimate and residential in scale, providing more privacy for players and staff. The building offers a private players’ entrance; landscaped space for outdoor training; and secured parking for players, coaches, and staff. Intimate garden spaces allow the team and staff to gather or spend quiet time on work or recovery.
On the Building Team:
Developers: Spurs Sports & Entertainment and Lincoln Property Company
Design architect and architect of record: ZGF
Local architect: RVK Architecture
MEP and structural engineer: ARUP USA, Inc.
Civil engineer: Pape-Dawson Engineers
Landscape architect: Rialto Studio
General contractor: Joeris General Contractors
Related Stories
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.