Structural engineering innovations were at the heart of a repositioning of the landmark 75 Rockefeller Plaza, former home of the Standard Oil Company. The project involved revitalizing the building’s façade and base metalwork, enhancing its lobby and retail spaces, and overhauling its mechanical systems and infrastructure.
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor, three of which supported existing transfer girders. When traditional approaches for transferring weight to accommodate the column removal proved too bulky and costly, the team adapted a structural approach common in bridge design: a composite-steel box girder. The solution met performance requirements and also coordinated with the planned sculpted lobby ceiling, which required the transfer members to be narrow and shallow.
Other innovations included the development of a unique “yolk” system, using 500-ton jacks, to preload a new steel box girder without the need for a temporary structure or shoring.
Project Summary
Honorable Mention
Building Team: Gilsanz Murray Steficek (submitting firm, SE) RXR Realty (developer, program manager) Kohn Pedersen Fox (architect) Robert Derector Associates (MEP) Orange County Ironworks (steel erector).
Details: 650,000 sf. Total cost: $150 million. Construction time: January 2013 to February 2017 Delivery method Design-bid-build.
SEE ALL OF THE 2017 RECONSTRUCTION AWARD WINNERS HERE
Related Stories
Reconstruction Awards | Nov 12, 2018
Cincinnati Music Hall: Saving a cultural anchor
Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.