flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

Reconstruction Awards

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration.


By BD+C Staff | November 16, 2016

Two long-concealed vaulted ceilings in the second-floor galleries were restored. The project had to obtain with numerous regulatory approvals. Courtesy Smithsonian American Art Museum.

The Renwick Gallery (1859) was designed by architect James Renwick, Jr., as the original Corcoran Gallery of Art. The National Historic Landmark is on the National Register of Historic Places and sits in the Lafayette Square Historic District. The Building Team, led by Westlake Reed Leskosky (lead architect) and Consigli Construction Co. (GC/CM), had to surmount numerous hurdles to gain approvals from the National Capital Planning Commission, the U.S. Commission of Fine Arts, the District of Columbia Historic Preservation Office, and even the Secret Service.

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration. 

The most difficult task involved the installation of an innovative rolling aluminum frame roof system. The retractable roof (from manufacturer HAKI) gave the team relatively efficient access to the cramped attic so that a new mechanical level could be constructed in that space. The new roof further protected the irreplaceable historic ceilings from the weather. The new mechanical system will keep the Renwick at the prescribed temperature and relative humidity to preserve the gallery’s artwork.

Consigli Construction laser scanned the structure to create a 3D BIM model that informed the rebuild of the attic and structural upgrades in the confined roof structure. The highly detailed model enabled the team to work within the building’s own structural system to add structural steel in the attic above the second-floor galleries, thus allowing for the installation of a robust art environment.

 

PROJECT SUMMARY 

 

Bronze Award Winner | Washington, D.C.

Building Team: Westlake Reed Leskosky (submitting firm, lead architect, MEP, sustainable design, lighting/technology, historic preservation); Consigli Construction Co. (submitting firm, GC/CM); The Smithsonian Institution (owner); Woods Peacock Engineering Consultants (SE); Wiles Mensch Corp. (CE); ATS Studios (historic restoration); Applied Environmental (hazmat); GHD/Protection Engineering Group (FP); MAS Building and Bridge (structural steel erector); Welsh and Rushe (mechanical contractor).

Details: 46,598 gsf, 34,000 nsf. Construction cost: $30 million. Construction time: January 2014 to November 2015. Delivery method: Design-bid-build.

Related Stories

Reconstruction Awards | Nov 11, 2019

Woolworth Tower Residences: What a view!

The one-time tallest building in the world is now home to an exclusive residential clientele.

Reconstruction Awards | Nov 8, 2019

2019 Reconstruction Awards: The 1060 Project at Wrigley Field

Venerable Wrigley Field is raised up in a top-to-bottom restoration that took five years to complete.

Reconstruction Awards | Nov 6, 2019

2019 Reconstruction Awards: Betting on a city's future

Can a new resort and casino pump life into a city once renowned as the nation’s arms maker?

Reconstruction Awards | Dec 4, 2018

BD+C's 2018 Reconstruction Award Winners

Cincinnati Music Hall, MASS MoCA Building 6, and 20 Times Square are just a few of the projects recognized as 2018 Reconstruction Award winners.

Reconstruction Awards | Dec 3, 2018

2018 Reconstruction Awards: Honorable mentions

These four projects won honorable mentions in BD+C's 2018 Reconstruction Awards.

Reconstruction Awards | Dec 3, 2018

Elgin Tower: Elgin's heart beats again

A project team brings this Chicago suburb’s landmark tower back to life.

Reconstruction Awards | Nov 30, 2018

Hawaiian Dredging Construction Company Building: GC to the rescue

Hawaii’s largest contractor saves one of the state’s prized architectural landmarks—and now calls it home.

Reconstruction Awards | Nov 30, 2018

5 Beekman Hotel and Residences: Back in business

A landmark office tower becomes one of N.Y.’s hottest lifestyle hotel destinations.

Reconstruction Awards | Nov 29, 2018

700 Constitution: Healthy living

Hospital turned apartment brings luxury living to a D.C. neighborhood – and saves a valued piece of architecture.

Reconstruction Awards | Nov 28, 2018

IBEW Local 134 Union Hall: Union lights a 'beacon'

Electrical workers’ local converts an abandoned Chicago school into a brightly lit union hall.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021