flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: Arc at Old Colony

Reconstruction Awards

Reconstruction Awards: Arc at Old Colony

The Arc at Old Colony's vintage floor plans, voluminous lobby, and myriad elevators were perfect for redevelopment as a historically charming residential building.


By BD+C Staff | November 16, 2016

The new rooftop patio at the Arc at Old Colony, which features studio, 1-, 2-, 3- and 4BR apartments. Five floors have been designated historic to retain their original corridor features and finishes. Courtesy CA Ventures.

Upon completion in 1894, the 17-story Arc at Old Colony became one of the tallest buildings in Chicago. In more recent times, its stylistically antiquated spaces, outmoded technology, and deteriorating infrastructure made it unsuitable for commercial use.

But owner Campus/MCJ Development JV saw the building’s 68-foot-wide vintage floor plans, voluminous lobby, and myriad elevators as perfect for redevelopment as a historically charming residential building.

The Building Team, helmed by design firm Pappageorge Haymes Partners, restored ornate turrets, a two-story terra cotta colonnade band, the projecting cornice, round oriel corner bays, and more than six hundred oversized windows.

Two exterior fire escapes were removed as part of the project, which meant that an enclosed staircase from the basement to the roof had to be built to provide a second means of egress. However, the building’s existing skin had large protruding cornices and brick kneels, which made the use of an outside hoist impossible.

So the team cleverly used a one-ton hoist to lift unitized sections of stairs up through the building and stage them on individual floors in three sections. 

 

Courtesy Pappageorge Haymes Partners.

 

PROJECT SUMMARY 

 

Silver Award Winner | Chicago, Ill.

Building Team: Pappageorge Haymes Partners (submitting firm, architect); Campus/MCJ Development JV (owner/developer); BKV Group (interior designer); Stearn-Joglekar (SE); AMS Mechanical Systems (ME); JMS Electrical Engineering; O’Sullivan Inc. (plumbing engineer); James McHugh Construction Co. (GC).

Details: 198,484 sf. Construction cost: $60 million. Construction time: February 2014 to July 2015. Delivery method: Design-build. 

Related Stories

Reconstruction Awards | Nov 27, 2018

Bedford Square: Revivifying urbanity

A suburban mixed-use redevelopment restores ‘the lost art of living closely.'

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021