A year ago, the University of Maryland–Baltimore County, in partnership with Howard Hughes Medical Institute, unveiled a 5,500-sf renovation within its 1970s-era Meyerhoff Chemistry Building.
Now called the Science Learning Collaboratory, the space serves two purposes: as chemistry, biology, and nursing classrooms during the school year; and as a training and research facility for HHMI staff in the summer. The institute provided $1.7 million for the renovation.
TOP RECONSTRUCTION ARCHITECTURE FIRMS
2014 Reconstruction Revenue ($)
1. Stantec $190,976,256
2. HDR $116,007,500
3. HOK $104,137,000
4. Perkins+Will $86,744,700
5. EYP $83,941,804SEE FULL LIST BELOW
TOP RECONSTRUCTION ENGINEERING FIRMS
2014 Reconstruction Revenue ($)
1. WSP | Parsons Brinckerhoff $131,401,721
2. Jensen Hughes $91,200,000
3. CRB $76,848,044
4. Wiss, Janney, Elstner Associates $67,773,600
5. Thornton Tomasetti $65,527,258SEE FULL LIST BELOW
TOP RECONSTRUCTION CONSTRUCTION FIRMS
2014 Reconstruction Revenue ($)
1. Turner Construction $2,737,284,000
2. Structure Tone $2,566,184,600
3. Gilbane Building Co. $1,788,350,000
4. Whiting-Turner $1,369,749,628
5. PCL Construction $1,076,381,683SEE FULL LIST BELOW
RECONSTRUCTION GIANTS
SPONSORED BY:
Architect/MEP engineer HDR created what it deems “the ultimate flexible space”: the lab can be completely reconfigured by students and faculty within 15 minutes. Benches, in modules of five, are movable and adjustable in height. Each bench has a utility module with quick-disconnect cables.
The lab’s fixed components are located mostly around its periphery. The full-height glass walls can be switched from clear to translucent. Experiments can be broadcast throughout the campus via new cameras and an internal AV system.
Steve Riojas, AIA, who directs HDR’s Science+Technology program, says many of the firm’s recent reconstruction projects have the same requirement: do more with less. “Generally, we are renovating buildings from the ’50s and ’60s, so the trick is to breathe state-of-the-art life into these old facilities,” he says.
This breath of fresh air, says HDR Project Manager Diana Hamlin, AIA, can sometimes provide more usable research area by eliminating traditional corridors and allowing circulation to flow within a lab or office’s “ghost” corridors.
AEC firms generally view renovation as more complex than new construction. “Adaptive reuse is more complicated because you have to forecast every little problem,” says Jackie Gilfillan, Director of Marketing and Development for City Constructors, in Los Angeles, where developers have been spending millions in that city’s downtown to restore buildings from the early 20th century.
City Constructors, which started in 2003 doing loft conversions, has lately struck gold working with the Kor Group to renovate its historic hotels. “These older buildings have a lot of charm that needed to be cleaned and polished,” Gilfillan says.
Sheila Ireland, AIA, NCARB, LEED AP BD+C, Senior Architect with Leo A Daly, says that more clients have come to appreciate their Mid-Century and Brutalist buildings. In the past, such buildings would have been re-skinned or demolished. Ireland says owners are leaning toward renovation versus new construction to retain the “superior quality” of older buildings.
Jessie Bauldry, a Designer in the firm’s Minneapolis–St. Paul office, adds that smaller cities increasingly value historic architecture and favor renovation over demolition.
Bauldry points to one client, Owatonna (Minn.) Public Utilities, which decided to repurpose a power plant that had ceased to be viable after a 2010 flood. That project required laser cloud mapping so that the designers could “understand the structure,” says Bauldry. The building was converted into office space.
In Omaha, Neb., the landmark Burlington Station is being repurposed into studio space for KETV NewsWatch 7. The 117-year-old rail station, originally built to resemble a Greek temple, was last remodeled in the 1930s. It hadn’t seen a passenger since 1974.
Leo A Daly, the project’s primary architect, retained its decorative rosette ceilings and over-the-door grills. Two windows that were filled in with plaster in the ’30s are being saved, albeit as pieces of framed artwork.
The building is being modernized with sophisticated electronic technologies and a new HVAC system.
DEALING WITH UNEXPECTED CONSEQUENCES
Renovation is sometimes seen by clients as a way to improve their company’s productivity. St. Louis-based architectural firm Remiger Design recently completed design and construction administration on Cass Information Systems’ newly renovated Global Headquarters for Transportation Information Services in Bridgeton, Mo. (Paric Corporation was the GC.)
This renovation completely reorganized the facility’s floor plan, with each department now occupying a dedicated space. Standardized workstations with lower panels and energy-efficient lighting were installed. “Workflow is more productive and employees are not required to move between locations as frequently,” says Remiger’s President, Vern Remiger. A sound-masking system allows for better acoustical privacy between departments.
In Lawrence, Kan., the Spencer Museum of Art at the University of Kansas is addressing long-standing accessibility and storage problems with a 30,000-sf makeover, representing about a third of the museum’s total area.
The project will feature a glass-encased entryway that welcomes visitors with natural light; a doubling of the current lobby’s space; new flooring and ceilings in selected galleries; an elevator and staircase connecting the third and fourth floors; and two-story glazing that allows natural light inside the galleries and connects the museum to the historic Marvin Grove.
This project wasn’t made any easier by the university’s decision to keep the museum’s 40,000-plus artworks and artifacts in the building during renovation. They will be stored in three secured gallery spaces controlled for dust, temperature, and humidity, says Gale Lantis, General Manager of Mar Lan Construction, the GC.
TOP RECONSTRUCTION ARCHITECTURE FIRMS
Company | 2014 Reconstruction Revenue ($) | |
1 | Stantec | $190,976,256 |
2 | HDR | $116,007,500 |
3 | HOK | $104,137,000 |
4 | Perkins+Will | $86,744,700 |
5 | EYP | $83,941,804 |
6 | CannonDesign | $83,000,000 |
7 | Callison RTKL | $82,619,853 |
8 | Wight & Company | $82,518,583 |
9 | Nelson | $63,424,841 |
10 | SmithGroupJJR | $59,147,521 |
11 | Leo A Daly | $57,353,740 |
12 | Perkins Eastman | $54,870,000 |
13 | DLR Group | $52,000,000 |
14 | HGA Architects and Engineers | $49,560,000 |
15 | HKS | $49,053,956 |
16 | ZGF Architects | $39,506,753 |
17 | Page | $36,594,000 |
18 | NORR | $36,530,066 |
19 | WD Partners | $36,317,400 |
20 | Corgan | $33,375,000 |
21 | Beyer Blinder Belle | $33,318,308 |
22 | FRCH Design Worldwide | $32,830,000 |
23 | Gresham, Smith and Partners | $30,460,000 |
24 | FreemanWhite | $28,483,207 |
25 | VOA Associates | $28,132,590 |
26 | MG2 | $22,868,457 |
27 | Flad Architects | $21,990,000 |
28 | Vocon | $21,986,228 |
29 | Glumac | $21,098,098 |
30 | CTA Architects Engineers | $21,032,917 |
31 | Ballinger | $20,358,102 |
32 | HNTB | $20,039,100 |
33 | Cuningham Group Architecture | $19,923,524 |
34 | Symmes Maini & McKee Associates | $19,816,165 |
35 | EwingCole | $18,942,000 |
36 | RS&H | $18,760,000 |
37 | Francis Cauffman | $17,429,343 |
38 | GBBN Architects | $17,270,000 |
39 | Hord Coplan Macht | $17,133,217 |
40 | Moseley Architects | $16,871,889 |
41 | GreenbergFarrow | $16,840,200 |
42 | LPA | $16,628,461 |
43 | Ware Malcomb | $15,900,000 |
44 | BSA LifeStructures | $15,113,920 |
45 | Harley Ellis Devereaux | $14,798,000 |
46 | Bergmann Associates | $14,750,000 |
47 | Clark Nexsen | $14,659,780 |
48 | SRG Partnership | $14,169,986 |
49 | Ennead Architects | $14,019,000 |
50 | Environetics | $13,769,351 |
51 | Shepley Bulfinch | $13,766,081 |
52 | Parkhill, Smith & Cooper | $11,742,000 |
53 | BRPH | $11,469,607 |
54 | BWBR | $11,103,583 |
55 | Cooper Carry | $11,014,263 |
56 | HMC Architects | $10,550,181 |
57 | FGM Architects | $10,355,450 |
58 | PBK | $9,890,000 |
59 | tvsdesign | $9,800,000 |
60 | Quattrocchi Kwok Architects | $9,702,000 |
61 | Luckett & Farley | $9,465,860 |
62 | Architects Hawaii Ltd. | $9,460,000 |
63 | Array Architects | $9,250,000 |
64 | Payette | $9,149,773 |
65 | Huckabee | $9,120,000 |
66 | Kirksey Architecture | $9,046,504 |
67 | Legat Architects | $9,015,000 |
68 | NAC|Architecture | $9,008,344 |
69 | Moody Nolan | $9,006,600 |
70 | RBB Architects | $8,980,000 |
71 | Fanning/Howey Associates | $7,978,213 |
72 | RNL Design | $7,918,643 |
73 | Westlake Reed Leskosky | $7,866,667 |
74 | CASCO Diversified Corp. | $7,800,000 |
75 | Lord Aeck Sargent | $7,549,124 |
76 | Albert Kahn Associates | $7,500,000 |
77 | Ashley McGraw Architects | $7,455,347 |
78 | Morris Architects | $7,330,000 |
79 | Harvard Jolly | $7,314,446 |
80 | Schenkel & Shultz | $7,153,000 |
81 | Solomon Cordwell Buenz | $6,784,484 |
82 | Fentress Architects | $6,541,367 |
83 | Rottet Studio | $6,480,852 |
84 | Cooper Robertson | $6,299,410 |
85 | Anderson Mikos Architects | $5,884,260 |
86 | BBS Architects and Engineers | $5,500,000 |
87 | Howell Belanger Castelli Architects | $5,456,568 |
88 | GWWO | $5,342,176 |
89 | Margulies Perruzzi Architects | $5,340,000 |
90 | BLDD Architects | $5,300,000 |
91 | Montroy Andersen DeMarco | $5,030,008 |
92 | Mancini•Duffy | $5,000,000 |
93 | FXFOWLE Architects | $4,952,542 |
94 | SEI Design Group | $4,857,600 |
95 | JLG Architects | $4,795,523 |
96 | LMN Architects | $4,499,700 |
97 | Sherlock, Smith & Adams | $4,487,000 |
98 | ai Design Group | $4,127,635 |
99 | Nadel | $4,000,000 |
100 | KZF Design | $3,782,894 |
101 | Rosser International | $3,740,424 |
102 | KSQ Architects | $3,690,428 |
103 | Mithun | $3,536,000 |
104 | DesignGroup | $3,234,923 |
105 | api(+) | $3,220,000 |
106 | Wilson Architects | $3,200,000 |
107 | TEG Architects | $3,167,484 |
108 | PBDW Architects | $3,131,797 |
109 | Becker Morgan Group | $3,046,131 |
110 | Integrus Architecture | $3,018,191 |
111 | JRS Architect | $3,000,000 |
112 | Carrier Johnson + Culture | $2,836,000 |
113 | Hnedak Bobo Group | $2,749,709 |
114 | TK Architects International | $2,566,026 |
115 | Cambridge Seven Associates | $2,551,000 |
116 | CO Architects | $2,480,200 |
117 | WDG Architecture | $2,440,524 |
118 | Good Fulton & Farrell | $2,400,160 |
119 | Inventure Design Group | $2,156,267 |
120 | Massa Multimedia Architecture | $2,000,000 |
121 | Hastings+Chivetta Architects | $1,862,058 |
122 | FitzGerald Associates Architects | $1,835,400 |
123 | Goettsch Partners | $1,761,000 |
124 | MBH Architects | $1,452,600 |
125 | FM Group | $1,404,000 |
126 | GSB | $1,282,890 |
127 | Jencen Architecture | $1,190,000 |
128 | HMFH Architects | $1,012,624 |
129 | Rule Joy Trammell + Rubio | $975,000 |
130 | SB Architects | $925,792 |
131 | EDI International | $850,000 |
132 | ATA Beilharz Architects | $616,000 |
133 | Schrader Group Architecture | $582,493 |
134 | Davis Brody Bond | $565,072 |
135 | Hoffmann Architects | $444,840 |
TOP RECONSTRUCTION ENGINEERING FIRMS
Company | 2014 Reconstruction Revenue ($) | |
1 | WSP | Parsons Brinckerhoff | $131,401,721 |
2 | Jensen Hughes | $91,200,000 |
3 | CRB | $76,848,044 |
4 | Wiss, Janney, Elstner Associates | $67,773,600 |
5 | Thornton Tomasetti | $65,527,258 |
6 | Dewberry | $60,119,724 |
7 | Leidos | $53,976,000 |
8 | Wendel | $52,860,580 |
9 | Core States Group | $51,140,425 |
10 | SSOE Group | $48,079,120 |
11 | Simpson Gumpertz & Heger | $45,971,000 |
12 | Syska Hennessy Group | $45,182,785 |
13 | STV | $43,281,000 |
14 | Environmental Systems Design | $37,253,125 |
15 | BR+A Consulting Engineers | $35,000,000 |
16 | Henderson Engineers | $33,173,416 |
17 | Vanderweil Engineers | $26,163,400 |
18 | ThermalTech Engineering | $23,000,000 |
19 | Highland Associates | $22,700,000 |
20 | Ross & Baruzzini | $21,878,043 |
21 | TTG | $20,286,002 |
22 | RMF Engineering | $19,820,000 |
23 | KCI Technologies | $19,750,000 |
24 | Epstein | $18,646,400 |
25 | Newcomb & Boyd | $17,936,713 |
26 | ME Engineers | $17,041,200 |
27 | Smith Seckman Reid | $16,360,677 |
28 | Affiliated Engineers | $15,260,000 |
29 | H.F. Lenz Company | $15,000,000 |
30 | Dunham Associates | $14,000,000 |
31 | Degenkolb Engineers | $13,597,001 |
32 | Carlson Design Construct | $13,000,000 |
33 | Zak Companies | $11,795,711 |
34 | TLC Engineering for Architecture | $11,453,660 |
35 | Walter P Moore | $11,056,693 |
36 | Walker Parking Consultants | $10,890,000 |
37 | CJL Engineering | $10,286,815 |
38 | I. C. Thomasson Associates | $10,070,000 |
39 | Bridgers & Paxton Consulting Engineers | $10,069,955 |
40 | Hankins & Anderson | $10,033,474 |
41 | Swanson Rink | $9,320,000 |
42 | Heapy Engineering | $9,253,141 |
43 | GHT Ltd. | $9,138,300 |
44 | Coffman Engineers | $8,970,600 |
45 | P2S Engineering | $8,132,000 |
46 | Aon Fire Protection Engineering | $8,061,347 |
47 | M/E Engineering | $7,555,935 |
48 | KLH Engineers | $6,632,678 |
49 | KPFF Consulting Engineers | $6,272,200 |
50 | SIGMA7 Design Group | $6,268,880 |
51 | LaBella Associates | $6,005,547 |
52 | Kamm Consulting | $5,808,190 |
53 | Jacobs | $5,230,015 |
54 | Hixson Architecture, Engineering, Interiors | $5,000,000 |
55 | CTLGroup | $5,000,000 |
56 | Wick Fisher White | $4,949,000 |
57 | Davis, Bowen & Friedel | $4,745,110 |
58 | Peter Basso Associates | $4,680,000 |
59 | DeSimone Consulting Engineers | $4,010,265 |
60 | OLA Consulting Engineers | $3,967,800 |
61 | Wallace Engineering | $3,820,000 |
62 | GRAEF | $3,807,500 |
63 | William Tao & Associates | $3,785,078 |
64 | Primera Engineers | $3,723,000 |
65 | Barge, Waggoner, Sumner and Cannon | $3,665,000 |
66 | Magnusson Klemencic Associates | $2,688,751 |
67 | Bala Consulting Engineers | $2,500,000 |
68 | G&W Engineering | $2,204,100 |
69 | Rist-Frost-Shumway Engineering | $2,000,000 |
70 | Cardno Haynes Whaley | $795,790 |
71 | GRW | $718,563 |
TOP RECONSTRUCTION CONSTRUCTION FIRMS
Company | 2014 Reconstruction Revenue ($) | |
1 | Turner Construction | $2,737,284,000 |
2 | Structure Tone | $2,566,184,600 |
3 | Gilbane Building Co. | $1,788,350,000 |
4 | Whiting-Turner Contracting, The | $1,369,749,628 |
5 | PCL Construction | $1,076,381,683 |
6 | Skanska USA | $778,766,695 |
7 | Mortenson Construction | $736,420,000 |
8 | Consigli Building Group | $717,304,157 |
9 | Shawmut Design and Construction | $706,182,000 |
10 | Balfour Beatty US | $678,173,095 |
11 | JE Dunn Construction | $657,784,441 |
12 | HITT Contracting | $655,900,000 |
13 | DPR Construction | $653,355,000 |
14 | Lend Lease | $609,284,000 |
15 | Clune Construction | $559,029,708 |
16 | Pepper Construction Group | $524,312,250 |
17 | Suffolk Construction | $504,918,447 |
18 | Barton Malow | $483,598,500 |
19 | Messer Construction | $460,286,774 |
20 | Holder Construction | $430,000,000 |
21 | McCarthy Holdings | $408,676,348 |
22 | Walbridge | $363,307,000 |
23 | James G Davis Construction | $353,227,747 |
24 | Clark Group | $350,789,750 |
25 | Beck Group, The | $277,082,899 |
26 | Adolfson & Peterson Construction | $260,500,892 |
27 | Flintco | $255,870,000 |
28 | Manhattan Construction | $230,989,000 |
29 | Robins & Morton | $213,900,000 |
30 | Leopardo Companies | $211,218,000 |
31 | JLL | $204,344,008 |
32 | LeChase Construction Services | $204,000,000 |
33 | Kraus-Anderson Construction | $203,000,000 |
34 | Walsh Group, The | $193,947,736 |
35 | C.W. Driver | $190,320,000 |
36 | O'Neil Industries | $182,525,267 |
37 | Boldt Company, The | $174,299,166 |
38 | LPCiminelli | $165,708,337 |
39 | IMC Construction | $160,000,000 |
40 | Alberici Constructors | $159,878,520 |
41 | Fortis Construction | $157,800,000 |
42 | S. M. Wilson & Co. | $143,754,811 |
43 | Power Construction | $134,000,000 |
44 | Ryan Companies | $131,468,021 |
45 | Hoar Construction | $125,037,000 |
46 | Bernards | $121,000,000 |
47 | Weis Builders | $113,799,030 |
48 | BlueScope Construction | $111,964,000 |
49 | Paric | $110,000,000 |
50 | Schimenti Construction | $105,000,000 |
51 | Coakley & Williams Construction | $104,427,010 |
52 | Level 10 Construction | $101,158,333 |
53 | James McHugh Construction | $100,458,258 |
54 | Weitz Company, The | $98,012,000 |
55 | McGough | $97,000,000 |
56 | Andersen Construction | $95,000,000 |
57 | Choate Construction | $94,064,627 |
58 | KBE Building Corp. | $86,437,734 |
59 | W. M. Jordan | $85,657,385 |
60 | Wight & Company | $82,518,583 |
61 | Hill International | $74,000,000 |
62 | EMJ | $66,000,000 |
63 | Hoffman Construction | $65,162,999 |
64 | Hill & Wilkinson | $60,368,741 |
65 | Yates Companies, The | $60,000,000 |
66 | Bette Companies, The | $59,014,330 |
67 | Stalco Construction | $57,040,000 |
68 | Haskell | $53,171,859 |
69 | Core States Group | $51,140,425 |
70 | Linbeck Group | $44,000,000 |
71 | Batson-Cook | $32,534,346 |
72 | Harkins Builders | $32,000,000 |
73 | Doster Construction | $31,340,717 |
74 | Austin Industries | $24,447,099 |
75 | Haselden Construction | $23,657,583 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.