The Raymond F. Kravis Center for the Performing Arts in West Palm Beach Fla., is set to receive $50 million worth of upgrades that will increase the size of the center and make it more user-friendly.
Upgrades include increasing the size of the Dreyfoos Hall Lobby, implementing new technology throughout, creating a pedestrian-friendly plaza, adding a new valet parking garage, building a new entrance/exit ramp to the existing parking garage, and improving traffic flow on and around the campus.
See Also: Florida mixed-use development uses wellness as the backbone of its design
The lobby expansion will see the glass curtain wall extended out by 30 feet. This will add 6,000 sf to the Dreyfoos Hall Lobby, providing more room for guests and reducing wait times at the bar, bistro, and other service areas. The expansion will include additional seating and restrooms.
Courtesy Leo A Daly.
The new valet parking garage will reduce traffic congestion and improve safety around the Center. It will be located on the east side of the building on the site of the former Amphitheater. Meanwhile, the new entrance and exit ramp to the self-parking garage will offer guests an easier way to access the fourth and fifth levels and improve traffic congestion in the garage as a whole.
The new pedestrian urban plaza will provide a park-like space that gives guests easier access to the Center. The area will feature expanded sidewalks, a bike path, and a waterfall fountain.
Courtesy Leo A Daly.
Technology improvements throughout the Center include closed-circuit video monitoring of the garage and entire campus; updated marketing, Box Office, and public information technology; the installation of a barcode system for tickets for ease of entry and improved security; electronic wayfinding; and additional security screeners at venue entrances.
Leo A Daly designed the design-build project with the Weitz Company serving as the general contractor and the Wantman Group providing landscape design. Construction began in May 2018 and is slated for completion in 2020.
Courtesy Leo A Daly.
Courtesy Leo A Daly.
Related Stories
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| Apr 12, 2011
Long-awaited San Francisco center is music to jazz organization’s ears
After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Jan 21, 2011
Music festival’s new home showcases scenic setting
Epstein Joslin Architects, Cambridge, Mass., designed the Shalin Liu Performance Center in Rockport, Mass., to showcase the Rockport Chamber Music Festival, as well at the site’s ocean views.