flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

PAC-CLAD Metal Wall Panel System Creates Vibrant Dimension Under Budget

Sponsored Content Metals

PAC-CLAD Metal Wall Panel System Creates Vibrant Dimension Under Budget


By PAC-CLAD | PETERSEN | June 24, 2020
PAC-CLAD Highline S1 metal wall panel system clads Del Valle Career & Tech Center in 3 shades of red
PAC-CLAD Highline S1 metal wall panel system clads Del Valle Career & Tech Center in 3 shades of red

The new Career and Technical Education Center (CTEC) on the campus of Del Valle High School in Del Valle, Texas, includes some very high-tech features. These include a health-science simulation lab and mock courtroom, along with automotive-repair and welding facilities. School administrators wanted an exterior that would reflect their future-focused programs and maintain its good looks over time. Metal cladding panels met both these requirements, and, as appropriate for the school’s mission, installers had to call on their own technical skills to put them into place. 

Del Valle’s CTEC is a 64,000 sq. ft., two-story facility that upgrades the school’s career-focused programming. Students are able to earn 23 different industry-recognized certifications and even college credit hours in a range of subject areas, including health science, visual communications and automotive services. According to the school, students were awarded 493 certifications and earned 751 college credit hours during the 2017-2018 school year, the year before the new CTEC opened. Approximately 2,000 of the school’s 3,330 students take some classes in the center.

 

PAC-CLAD Highline S1’s Unique Shadow Effect Provides An Economical Solution

With the sophistication and expense required to outfit the school’s sophisticated interior spaces, designers with Austin, Texas-based Pfluger Architects needed to specify economical exterior materials that are bold enough to make a statement. The combination of masonry and metal wall panels they chose ties the CTEC to the existing high school and to the recently added fine arts and athletics facilities – also designed by Pfluger. They specified Petersen’s PAC-CLAD Highline S1 panels to clad the upper two-thirds of the structure. The mix of finishes and profiles add visual interest and a high-tech appeal, with colors that pop and installation detailing that creates unique shadow effects.

PAC-CLAD Highline S1 metal wall panel system in 3 shades of red

For example, 0.22-gauge steel panels in three custom red finishes – Cardinal, Ron and Tor – clad protruding window bays, a corner stairwell and the automotive bays. The rows of vertically mounted panels in alternating finishes create a shadow-suggesting ripple effect. Most of the remaining wall surface is clad in similar, horizontally running panels featuring a Bone White finish, with the panels that define the window areas finished in Cityscape. 

All of the panels are installed at varying depth, which enhances shadowing throughout the day. According to Dallas Goodman, representative with the installing Texas Roofing Co. of Round Rock, Texas, designers specified the red panels to be installed 2 in. from the exterior substrate, with the Cityscape panels 3 in. from the substrate and Bone panels 7 in. from the substrate.

“In the initial design stage, we discussed what they were looking for and the depth of the panels,” he said. “The red panels repeat a pattern every fifty-second panel, and the architect had that on the drawings.”

The process of ensuring all of the panels were installed at the correct distance from the substrate wall was a new experience for Goodman. “Typically, you might have a fascia band” with a similar effect, he said. “But something like this – this is the first I’ve done.”

PAC-CLAD Highline S1 metal wall panel system clads Del Valle Career & Tech Center in 3 shades of red

In total, 40,300 sq. ft. of Petersen’s PAC-CLAD wall panels were used in the project, along with 3,500 sq. ft. of 24-gauge steel Tite-Loc Plus standing seam panels used as canopy roofing over the school’s automotive bays. Goodman says the company played a key role in the project’s success.

“Petersen did our shop drawings,” he said. “All of it was custom-run, except the Bone White and Cityscape panels, so they were integral in making sure we had what we needed, onsite, when we needed it.”

Photos: alanblakely.com
 

 

Contact Info: 
Phone: 800-PAC-CLAD
Email: info@PAC-CLAD.com
Website: PAC-CLAD.com

Tags

Related Stories

| Apr 5, 2011

SSPC, AISC announce joint standard for paint shop certification

SSPC: The Society for Protective Coatings and the American Institute of Steel Construction (AISC) are pleased to announce a joint certification standard for shop application of protective coatings. The standard, "Certification Standard for Shop Application of Complex Protective Coating Systems," describes requirements for certification of firms that shop apply complex painting systems.

| Mar 10, 2011

Steel Joists Clean Up a Car Wash’s Carbon Footprint

Open-web bowstring trusses and steel joists give a Utah car wash architectural interest, reduce its construction costs, and help green a building type with a reputation for being wasteful.

| Mar 8, 2011

ThyssenKrupp Nirosta, Christian Pohl GmbH supply stainless steel to One World Trade Center

Corners of the One World Trade Center 's facade will be edged with stainless steel made in Germany. ThyssenKrupp Nirosta (Krefeld) produced the material at its Dillenburg plant using a customized rolling and heat-treatment process. Partner company Christian Pohl GmbH (Cologne) fabricated the material into complex facade elements for the corners of the New York City skyscraper. 

| Feb 22, 2011

Military tests show copper increases HVAC efficiency, reduces odors

Recent testing, which is being funded by the Department of Defense, is taking place in military barracks at Fort Jackson, South Carolina. Side-by-side comparisons demonstrate that air conditioning units made with copper suppress the growth of bacteria, mold, and mildew that cause odors and reduce system energy efficiency.

| Dec 17, 2010

Gemstone-inspired design earns India’s first LEED Gold for a hotel

The Park Hotel Hyderabad in Hyderabad, India, was designed by Skidmore, Owings & Merrill to combine inspirations from the region’s jewelry-making traditions with sustainable elements.

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Oct 11, 2010

MBMA Releases Fire Resistance Design Guide for metal building systems

The Metal Building Manufacturers Association (MBMA) announces the release of the 2010 Fire Resistance Design Guide for Metal Building Systems. The guide provides building owners, architects, engineers, specifiers, fire marshals, building code officials, contractors, product vendors, builders and metal building manufacturers information on how to effectively meet fire resistance requirements of a project with metal building systems.

| Sep 13, 2010

7 Ways to Economize on Steel Buildings

Two veteran structural engineers give you the lowdown on how to trim costs the next time you build with steel.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021