flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Office-to-residential conversions put pressure on curbside management and parking

Adaptive Reuse

Office-to-residential conversions put pressure on curbside management and parking

Vehicle storage, bike and bus lanes, and drop-off zones need attention


By Peter Fabris, Contributing Editor | January 12, 2024
Image by GLady from Pixabay
Image by GLady from Pixabay

With many office and commercial buildings being converted to residential use, two important issues—curbside management and parking—are sometimes not given their due attention. Cities need to assess how vehicle storage, bike and bus lanes, and drop-off zones in front of buildings may need to change because of office-to-residential conversions.

Curbside space is a hot commodity for residents who want to be picked up or dropped off near the building entrance.

In commercial and mixed-use settings, short-term parking for delivery drivers is essential. Mass transit stops and parking for cars, bikes, and micromobility vehicles also require curbside space.

City planners are challenged to create traffic configurations and allocate enough space for all uses. Studies of how curbsides are being used can help planners better design solutions. 

Added parking meters or activated alleyways are among the possible remedies for office-to-residential conversions.

Related Stories

Coronavirus | May 18, 2020

Will empty hotels provide an answer for affordable housing shortage?

A Los Angeles-based startup sees the Midwest as most fertile for adaptive reuse.

Adaptive Reuse | Jun 11, 2019

The power and possibility of adaptive reuse

Building reuse generally offers greater environmental savings than demolition or new construction.

Adaptive Reuse | Jul 9, 2018

Work, park, live: Inside Cincinnati’s parking garage turned lifestyle hotel

The Summit hotel and conference center is a converted parking garage that was once a factory.

Office Buildings | Jun 6, 2018

Final Cut: Jupiter Entertainment’s new production studio in New York combines office and editing spaces

The project team completed this full-floor renovation in four months.

Adaptive Reuse | Jun 4, 2018

Pop-up retail market on Chicago’s Randolph Street will be made of repurposed shipping containers

Related Midwest will open the market at 725 W. Randolph St. later this week.

Adaptive Reuse | May 7, 2018

A decade after it debuted, Beijing’s 798 Arts District is still a work in progress

China’s third-most-popular tourist attraction remains a magnet for creative tenants.

Adaptive Reuse | Apr 26, 2018

Edison Lofts building is New Jersey’s largest non-waterfront adaptive reuse project

Minno & Wasko Architects & Planners designed the building.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021