flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

M+W Group acquires LifeTek Solutions in America

M+W Group acquires LifeTek Solutions in America

 

Acquisition intended to strengthen M+W's technological and process expertise in the Life Sciences industry.


By BD+C Staff | March 29, 2013

 

The global engineering and construction company M+W Group has announced 
that their operations in the Americas have acquired 100% ownership of LifeTek 
Solutions, Inc. With this acquisition, M+W Americas also obtains LifeTek’s 
25% share in the exclusive SmartFit Modular BioSuites and FillSuites.
 
LifeTek’s team of industry recognized experts specialize in developing technically 
driven projects in the pharmaceutical and biotechnology communities. Adept in the 
design of equipment and arrangements for these projects, the LifeTek team has the 
operating, maintenance, design, construction, and qualification background that 
founds a thorough understanding of how best to compose a manufacturing process 
and ensure their customers success. Their exclusive SmartFit modular BioSuites 
and FillSuites cut delivery time in half while providing proven field-tested 
performance. 
 
“Emerging technologies in the Life Science industries are transforming the way 
therapeutics are manufactured. The synergy between M+W Group and LifeTek will 
bring a world of innovative technology and expertise to our clients, assisting them to 
embrace new processes and streamline project delivery.” said Rick Whitney, 
President and CEO of M+W Americas.
 
“We are very excited about this acquisition.” commented George Wiker, Principal of 
LifeTek. “Together, M+W Group and LifeTek will provide customers with unmatched 
engineering depth in a single-firm solution from concept to start-up.”
 
 
About M+W Group (www.mwgroup.net): M+W Group is the leading global engineering, 
construction and project management company in the fields of Advanced Technology 
Facilities, Life Science & Chemicals, Energy & Environment Technologies and High-Tech 
Infrastructure. From concept development to turnkey services the company manages projects 
of all sizes ensuring rapid realization, high quality standards and cost-effective completion. 
With its competence to link process and automation technologies and complex facilities to 
integrated solutions M+W Group primarily focuses on leading companies in the fields of 
electronics, photovoltaics, life science, chemicals, energy, automotive, security and 
communication, as well as research institutes and universities. M+W Group is the holding 
company with headquarters in Stuttgart, Germany. In 2011 the company generated an order 
intake of $3.6 billion and revenues of $3.5 billion with more than 7,000 employees. In 2012 
M+W Group celebrated its 100th anniversary.
 
M+W Group is owned by the Austrian Stumpf Group that is globally successful in the areas of 
High-Tech Engineering, Smart & Renewable Energy, Real Estate and Technology 
Investments.
 
About LifeTek (www.lifetek.com): LifeTek is a design and consulting team who work to help 
BioPharm companies succeed in developing processes, build manufacturing capacity as well 
as establish & maintain compliance. LIFETEK focuses exclusively on pharmaceutical and 
biological projects with a strong understanding that the design of a pharmbio project begins 
with the process, whether it is a laboratory, pilot plant, or full scale manufacturing 
facility. LifeTek’s philosophy is to provide a unique solution to the needs of its client base by 
providing standard and validateable process designs and process systems to improve 
delivery, reduce cost and assure successful startup while minimizing risk.
About SmartFit Modular (www.smartFit.com): SmartFit Modular offers complete 
bioprocessing and aseptic filling suites which can be erected within an existing building, 
anywhere in the world. SmartFit suites can accommodate projects from development through 
market launch. The affordable solution can speed the rate of return on the investment.
 
Source: M+W Group

Related Stories

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

boombox1 - default
boombox2 -
native1 -

More In Category



AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021