flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Merck KGaA is expanding its R&D hub in the U.S.

Public Health Labs

Merck KGaA is expanding its R&D hub in the U.S.

The 145,000-sf addition will be built to meet LEED and WELL certification standards.


By John Caulfield, Senior Editor | February 14, 2019

EMD Serono, which is the name Merck KGaA operates under in the U.S. and Canada, is expanding its R&D facility in Billerica, Mass., one of four such life science facilities that the Germany-based corporation has worldwide. Image: EMD Serono

EMD Serono, an affiliate of Merck KGaA, the Darmstadt, Germany-based healthcare and life sciences company, is investing another $70 million to double the size of its research and development facility in Billerica, Mass., which opened in February 2011.

The 145,000-sf expansion on 47 acres is expected to break ground in the second quarter of this year, and be completed by the second quarter of 2021. The new building will accommodate 400 new and current R&D employees who will focus on advancing science in oncology, immuno-oncology, and immunology.

Billerica’s Planning Board approved the expansion, without protest, on February 12, when it also okayed a waiver of a formal traffic study as long as the company provides a traffic memorandum for peer review. Merck KGaA’s investment includes about $55 million in construction costs, and several million dollars for laboratories and equipment.

With this latest project, Merck KGaA will have invested more than $150 million in infrastructure and construction in the state of Massachusetts, and created more than 150 new jobs. That investment “is a testament to the state’s global leadership in life sciences,” says Travis McCready, President and CEO of the Massachusetts Life Sciences Center.

When it’s completed, the new building will include wet labs, office space, and a cafeteria. It will be built to meet LEED and WELL performance standards. (The existing facility is WELL certified.) The Building Team on this project includes PM Group (architect), INTEC (interior design), Erland Construction (CM), BR+A Consulting Engineers (mechanical and electrical engineer), and BSC Group (CE).

Billerica is one of 10 locations in Massachusetts where Merck KGaA employs more than 2,800 people. Billerica is also one of Merck KGaA’s four global R&D hubs, the others being in Germany, Japan, and China. Merck KGaA invests about 20% of its total annual sales in R&D.

Related Stories

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Apr 2, 2014

Check out the stunning research facility just named 2014 Lab of the Year [slideshow]

NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards. 

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 18, 2014

6 keys to better healthcare design

Healthcare facility planning and design experts cite six factors that Building Teams need to keep in mind on their next healthcare project.

| Mar 18, 2014

How your AEC firm can win more healthcare projects

Cutthroat competition and the vagaries of the Affordable Healthcare Act are making capital planning a more daunting task than ever. Our experts provide inside advice on how AEC firms can secure more work from hospital systems.

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

Top 70 Science + Technology Facility Engineering Firms for 2023

Jacobs, Fluor, SSOE, Tetra Tech, and Affiliated Engineers head BD+C's ranking of the nation's largest science and technology (S+T) facility engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking factors revenue from all science and technology (S+T) buildings work, including laboratories, research buildings, technology/innovation buildings, pharmaceutical production facilities, and semiconductor production facilities.


Giants 400

Top 100 Science + Technology Facility Architecture Firms for 2023

Gensler, HDR, Page Southerland Page, Flad Architects, and DGA top BD+C's ranking of the nation's largest science and technology (S+T) facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking factors revenue from all science and technology (S+T) buildings work, including laboratories, research buildings, technology/innovation buildings, pharmaceutical production facilities, and semiconductor production facilities.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021