flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Merck KGaA is expanding its R&D hub in the U.S.

Public Health Labs

Merck KGaA is expanding its R&D hub in the U.S.

The 145,000-sf addition will be built to meet LEED and WELL certification standards.


By John Caulfield, Senior Editor | February 14, 2019

EMD Serono, which is the name Merck KGaA operates under in the U.S. and Canada, is expanding its R&D facility in Billerica, Mass., one of four such life science facilities that the Germany-based corporation has worldwide. Image: EMD Serono

EMD Serono, an affiliate of Merck KGaA, the Darmstadt, Germany-based healthcare and life sciences company, is investing another $70 million to double the size of its research and development facility in Billerica, Mass., which opened in February 2011.

The 145,000-sf expansion on 47 acres is expected to break ground in the second quarter of this year, and be completed by the second quarter of 2021. The new building will accommodate 400 new and current R&D employees who will focus on advancing science in oncology, immuno-oncology, and immunology.

Billerica’s Planning Board approved the expansion, without protest, on February 12, when it also okayed a waiver of a formal traffic study as long as the company provides a traffic memorandum for peer review. Merck KGaA’s investment includes about $55 million in construction costs, and several million dollars for laboratories and equipment.

With this latest project, Merck KGaA will have invested more than $150 million in infrastructure and construction in the state of Massachusetts, and created more than 150 new jobs. That investment “is a testament to the state’s global leadership in life sciences,” says Travis McCready, President and CEO of the Massachusetts Life Sciences Center.

When it’s completed, the new building will include wet labs, office space, and a cafeteria. It will be built to meet LEED and WELL performance standards. (The existing facility is WELL certified.) The Building Team on this project includes PM Group (architect), INTEC (interior design), Erland Construction (CM), BR+A Consulting Engineers (mechanical and electrical engineer), and BSC Group (CE).

Billerica is one of 10 locations in Massachusetts where Merck KGaA employs more than 2,800 people. Billerica is also one of Merck KGaA’s four global R&D hubs, the others being in Germany, Japan, and China. Merck KGaA invests about 20% of its total annual sales in R&D.

Related Stories

| Nov 17, 2014

A new BSL-3 public-safety lab debuts in Vermont

The laboratory will be used to perform a wide range of analyses to detect biological, toxicological, chemical, and radiological threats to the health of the population, from testing for rabies, West Nile, pertussis and salmonella to water and food contaminants.

| Nov 4, 2014

HOK breaks ground on colossal research complex for LG in Seoul

Located in Seoul’s Magok District, the LG Science Park provides facilities to support innovative research and industrial prototyping. HOK designed phase one of the master plan and six of the laboratory and office buildings.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Oct 9, 2014

Beyond the bench: Meet the modern laboratory facility

Like office workers escaping from the perceived confines of cubicles, today’s scientists have been freed from the trappings of the typical lab bench, writes Perkins+Will's Bill Harris.

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 19, 2014

Smithsonian Institution opens LEED Platinum lab facility

The Charles McC. Mathias Laboratory will emit 37% less CO2 than a comparable lab that does not meet LEED-certification standards.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

Top 70 Science + Technology Facility Engineering Firms for 2023

Jacobs, Fluor, SSOE, Tetra Tech, and Affiliated Engineers head BD+C's ranking of the nation's largest science and technology (S+T) facility engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking factors revenue from all science and technology (S+T) buildings work, including laboratories, research buildings, technology/innovation buildings, pharmaceutical production facilities, and semiconductor production facilities.


Giants 400

Top 100 Science + Technology Facility Architecture Firms for 2023

Gensler, HDR, Page Southerland Page, Flad Architects, and DGA top BD+C's ranking of the nation's largest science and technology (S+T) facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking factors revenue from all science and technology (S+T) buildings work, including laboratories, research buildings, technology/innovation buildings, pharmaceutical production facilities, and semiconductor production facilities.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021