flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This Marriott is poised to take over the title as the world’s tallest modular hotel

Modular Building

This Marriott is poised to take over the title as the world’s tallest modular hotel

Danny Forster & Architecture designed the building.


By David Malone, Associate Editor | May 13, 2019
Rendering of completed hotel

All images courtesy Danny Forster & Architecture.

Carrying the brand of Marriott International, a new 26-story, 360-foot-tall tower will become the largest modular hotel in the world upon completion.

The hotel, designed by Danny Forster & Architecture, will be built over a 90-day period and topped with a modular roof and modular rooftop bar. All 168 guest rooms will be prefabricated and pre-furnished. The rooms will arrive at the site, 842 Sixth Avenue, fully constructed with finished painted walls, beds, sheets, pillows, flooring, and toiletries. The building’s public areas, such as the restaurant and lobby, will be built using traditional methods.

 

AN example of one of the modular guest rooms

See Also: Amazon invests in a prefab module supplier

 

This hotel takes every advantage of off-site manufacturing, as you might expect. But it does so in a way that defies expectation,” says Danny Forster, Principal, Danny Forster & Architecture, in a release. “We wanted to demonstrate that modular building can do more than just harness the efficiencies of the factory. It can produce a graceful and iconic tower. And yes, it can do so at the rate of an entire floor a day.”

The $65 million hotel is slated to open in late 2020 as the AC Hotel New York NoMad.

Related Stories

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| May 30, 2013

The Make It Right squabble: ‘How many trees did you plant today?’

A debate has been raging in the blogosphere over the last few months about an article in The New Republic, “If You Build It, They Might Not Come,” in which staff writer Lydia DePillis took Brad Pitt’s Make It Right Foundation to task for botching its effort to revitalize the Lower Ninth Ward of New Orleans.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Feb 28, 2013

Novel multifamily solutions to be presented at New York Modular Construction Summit

The New York Modular Construction Summit will be co-hosted by the Modular Building Institute and Pratt Institute School of Architecture on May 16, 2013, in Brooklyn, N.Y.

| Feb 22, 2013

Starbucks pilot program rolls out small, modular stores

Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.

| Feb 14, 2013

Boxman Studios launches shipping container buildings division

Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021