flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

March 2012: New Projects Portfolio

March 2012: New Projects Portfolio

California apartment project brings together young and old; DOD’s largest inpatient hospital completed; and the nation’s first LEED Silver sorority house.


By By Leslie Streicher, Associate Editor | March 2, 2012
This article first appeared in the March 2012 issue of BD+C.

Claremont, Calif., apartment project brings together young and old

Jamboree Housing Corp. has completed construction on the Courier Place Apartment Homes in Claremont, Calif., one of only a few affordable housing projects in the Golden State designed to achieve LEED Platinum. A transit-oriented development, the multigenerational apartment building serves both working families and senior citizens. William Hezmalhalch Architects designed the building, and Advent Companies provided construction services. Green features include low-VOC interior paint and ultra low-flow toilets.

[pagebreak]

60-bed hospital in Alabama admits first patients, gets new president

Madison Hospital in Madison, Ala., has officially opened for patient care. The 60-bed facility was built by Robins & Morton (GC) of Birmingham and was designed by Chapman Sisson Architects of Huntsville, Ala. HKS Architects provided healthcare design support. An emergency department, surgical center, medical imaging laboratory, and sleep center comprise the 75,000-sf facility. Executive staff from Huntsville Hospital managed the project, and Mary Lynne Wright, a 33-year-veteran nurse executive, has been appointed president of the new facility. Total project costs are estimated around $71 million.

[pagebreak]

Defense Department’s largest inpatient hospital completed in San Antonio

The Washington, D.C., office of architecture firm RTKL Associates has completed a new hospital tower for the San Antonio Military Medical Center in Texas. The two-million-sf tower adds more than 100 beds, bringing the fully operational facility to 425 inpatient beds with expansion capability of more than 50 beds. Financed with more than $450 million in Base Realignment and Closure 2005 funds, the tower is the U.S. Department of Defense’s only Level 1-certified trauma center with a world-class burn and eye center and a rooftop helipad. It is the DoD’s largest inpatient hospital and ambulatory service facility in the U.S. The building is designed to recycle 50,000 gallons of water a day and achieve 21% energy cost savings over a  comparable conventional hospital. The project is set to receive LEED Silver certification.

[pagebreak]

Nation’s first LEED Silver sorority house opens at Mississippi State

The Mississippi Gamma Chapter of Pi Beta Phi, at Mississippi State University in Starkville, has achieved LEED-NC Silver certification on its sorority house. CxGBS, the commissioning agent, worked with Pi Beta Phi and its facility management entity, Fraternity Housing Corp., to ensure project specifications and requirements for LEED certification were met. The new Pi Beta Phi House is nearly 20,000 sf and incorporates numerous sustainable features. Building Team members include Pryor & Morrow Architects and West Brothers Construction.

[pagebreak]

Renovation of senior living community enhances tranquil residential life

Nauset Construction recently completed the renovation of The Gables at Winchester, an independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass. Designed by architectural firm Levi+Wong Design Associates, the 40,000-sf project includes a stadium-style theater, library, fitness center, and bistro within the Winchester, Mass., campus. The multi-million dollar project was completed in three phases over a 14-month period to minimize disruptions to the residents. A new activity room with a grand main entrance features traditional architectural details with high-end finishes. Residents enjoy landscaped outdoor patios with stone wall seats, blue stone in-lays, and warm exterior lighting.

[pagebreak]

Orthopedic care office repurposed to facilitate physical therapy and rehabilitation services

The Barrington Orthopedic Specialists in Elk Grove Village, Ill., has been renovated and expanded by Meridian Design Build. The project, which was completed in just 64 working days, involved the full renovation of an existing single-story office building to repurpose it for medical use. The design includes a physical therapy gym, exam rooms, cast rooms, imaging areas, and full-service rehabilitation facilities. The addition accommodates reception and waiting areas and a covered patient drop-off canopy. Arete-Knight provided architectural, structural, MEP/fire protection, and interior design services.

Related Stories

Affordable Housing | Feb 15, 2023

2023 affordable housing roundup: 20+ multifamily projects

In our latest call for entries, Building Design+Construction collected over 20 multifamily projects with a focus on affordable housing. Here is a comprehensive list of all projects in alphabetical order.

Multifamily Housing | Feb 11, 2023

8 Gold and Platinum multifamily projects from the NAHB's BALA Awards

This year's top BALA multifamily winners showcase leading design trends, judged by eight industry professionals from across the country.

Multifamily Housing | Jan 12, 2023

8 noteworthy multifamily housing projects, including a refuge for unsheltered youth

Join us on a nationwide tour of notable new multifamily projects from around the country.

Adaptive Reuse | Dec 21, 2022

University of Pittsburgh reinvents century-old Model-T building as a life sciences research facility

After opening earlier this year, The Assembly recently achieved LEED Gold certification, aligning with the school’s and community’s larger sustainability efforts.

| Jul 11, 2014

First look: Jeanne Gang reinterprets San Francisco Bay windows in new skyscraper scheme

Chicago architect Jeanne Gang has designed a 40-story residential building in San Francisco that is inspired by the city's omnipresent bay windows.

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 21, 2014

2013: The year of the super-tall skyscraper

Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021