This project encompasses a new City Hall and civic chambers, a new headquarters for the Port of Long Beach, and a public library. It replaced a maintenance-plagued and seismically unsafe building with a multifaceted development that is expected to play a seminal role in revitalizing Long Beach’s downtown.
The new Civic Center, which is divided into four structures that stretch across six city blocks, registered a number of firsts: It was the largest municipal public-private partnership in the U.S., and the first municipal project in North America that was design-build-finance-operate-maintain (DBFOM). It was also the first to combine infrastructure and private development within a single project.
The Civic Center was designed to performance-based criteria that exceed the California Building Code. The new building can be utilized within seven days of a significant seismic event and be fully functional within 30 days.
Rooftop photovoltaic panels are among the building’s sustainable elements. The building targeted LEED Gold certification.
The Building Team and its client strove to achieve several goals. They wanted a building that would exude civic gravitas and at the same time provide the best value for taxpayers. The building had to energize the immediate downtown community. A grid with a regional bike network, buses, and Metro Blue Line would accentuate the connection between the Civic Center district and the downtown area.
The Civic Center’s design embraced the nine guiding principles in Long Beach’s Downtown Plan. It was also influenced by more than 100 community meetings, information sessions, and design charrettes.
Colocating the principal design and construction team members on site with major subcontractors, while key decision makers for the client were located across the plaza in the old City Hall, was critical to the success of the project. Further contributing to this project’s efficiency was the design-build team’s transition to a digital-platform-only construction document approach.
Efficiency was also evinced in offsite prefabrication of more than 330,000 sf of unitized curtain wall, whose 3,362 panels were assembled on-site in only six months—less than half the time of traditional erection methods. The team’s innovative approach to the system’s fabrication and installation saved the City of Long Beach nearly $1 million.
All told, the Building Team delivered the new Civic Centers two days ahead of schedule. Construction entailed 1.8 million worker hours, with zero lost time incidents. The project’s recordable incident rate of 0.22 was far below the 3.10 national average.
Structural timbers at the Library building showcase an aesthetically pleasing and operationally efficient design solution.
The finished product is distinguished by floor-to-ceiling windows on every level that allow light into the building’s core. Its library features exposed structural timbers that support the building and serve as a final finish surface. This strategic use of highlighting exposed structures provided the most effective first cost installation, as well as the most advantageous long-term lifecycle maintenance and replacement costs.
The new City Hall is expected to consume 25% of the energy of the structure it replaces. This project, which targeted LEED Gold certification, includes a rooftop photovoltaic array.
The Civic Center also showcases the latest operational technology. For example, the Port and City Hall are equipped with high-tech, low-voltage systems that include automated security entrances, high-speed data cabling to every workstation, and high-end audiovisual networks.
Submitting firm and GC: Clark Construction Group
Owner: City of Long Beach
Developer: Plenary Properties Long Beach
Co-developer: Edgemoor Infrastructure & Real Estate
Architect: Skidmore, Owings & Merrill
MEP Engineer: Syska Hennessy
Structural Engineer: SOM Structural, Nabih Youssef Associates
CM: City of Long Beach
Size: 595,500 sf
Construction time: July 2016 to June 2019
Cost: $557 million
Delivery method: Design-Build
Photo credit: Fukishima Photography
Related Stories
Building Team Awards | Oct 24, 2020
Emory University Student Center wins the top award in 2020 Building Team Awards
Emory University Student Center wins the top award in 2020 Building Team Awards
Building Team Awards | Oct 22, 2020
Look up to the skies
The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.
Building Team Awards | Oct 22, 2020
Judging a book by its cover
The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
Big Room equals big results
Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
New York’s STEM epicenter and career gateway
The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Seamless speed to market drives Texas hospital’s growth
Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Winning with teamwork
The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.
Coronavirus | Oct 8, 2020
The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability
The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.