flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

LA's game changer: Wilshire Grand Center

Building Team Awards

LA's game changer: Wilshire Grand Center

Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.


By David Barista, Editorial Director | May 22, 2018

At 1,100 feet, the 73-story Wilshire Grand Center is the tallest tower in Los Angeles and the nation’s tallest building west of Chicago. But its significance to the City of Angels is greater than its height. The billion-dollar project, developed by Korean Air and its parent company Hanjin International, is the latest addition to the city’s rejuvenated downtown, bringing 900 four-star hotel rooms, 400,000 sf of Class A office space, and more than 45,000 sf of retail and restaurants to the city center.

Topping the tower is a first for Los Angeles: a sloped, sail-shaped spire that stands out in a city of flat-topped structures. The 172-foot-tall, glass-and-steel structure would normally be prohibited in Los Angeles, due to a long-standing city ordinance that requires a helicopter pad on all buildings over 75 feet in height.

Looking to create a distinctive aesthetic for the Wilshire Grand Center—and a one-of-a-kind “sky lobby” for guests of the InterContinental Los Angeles Downtown hotel, which occupies the upper half of the tower—the project team collaborated with city officials on a variance to the city code. The solution involved placing a small pad at the midpoint of the spire that allows a portion of the helicopter to touch down. The design scheme also permits emergency personnel to be lowered onto and gain access to the roof. This performance-based approach could change the city’s skyline for years to come, if future projects follow suit.

To maximize leasable space and views of the city, the design team developed a structural solution that downsized the exterior columns while meeting structural and seismic performance requirements. The composite structure features a hardened concrete core with a structural steel frame that is supplemented with three levels of buckle-resistant bracing, which act as shock absorbers against earthquakes. The composite structural solution is a first for downtown Los Angeles.

These creative solutions were the result of a close-knit project team—owner, architect, engineers, contractor, subcontractors—that was assembled early during the design process. The team used design-assist delivery for the vertical transportation and building envelope design, as well as design-build MEP trade partners, prior to the start of design development. Early coordination helped the team solve complex issues. For instance, the team utilized prefab bathroom pods—698 in all—to shave roughly 100 man-hours per bathroom off the schedule, ensuring the project would be completed on time.

 

Prefab bathroom pods were among a host of innovations employed by the Building Team to pull off this ground-breaking high-rise project. Gary Leonard, Courtesy Turner.

 

Building Team — Submitting firm, general contractor Turner Construction Company Owner Hanjin International Architect AC Martin Partners Structural engineer Brandow & Johnston Mechanical engineer ACCO Engineered Systems Electrical engineer Rosendin Electric Plumbing engineer Pan Pacific Mechanical Construction manager Martin Project Management

General Information — Size 2.1 million sf Construction cost $1 billion Construction time September 2012 to June 2017 Delivery method CM at Risk

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021