flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kawneer curtain walls create the perfect learning environment

Sponsored Content

Kawneer curtain walls create the perfect learning environment


By Kawneer | May 23, 2022
Versoleil SunShade - Outrigger System - for Curtain Wall

With an ever-growing student body, Fayetteville High School in Arkansas decided to expand its capacity while creating a new, improved environment using Kawneer curtain walls to help students fulfill their potential. Three renowned architectural firms came together to design and build an impressive 530,000-square-foot campus capable of housing 3,000 students. It comprises two massive building blocks with a new arena, performing arts center, auditorium, music and athletic spaces, student commons, food service and administrative offices.
Despite being able to accommodate a large student population, the school was planned around the principle of multiple, independent small learning communities (SLCs) with 700 students. Each community has access to various rooms such as flexible multimedia labs, woodworking shops, robotics labs and bleacher-like grand staircases that transform into mini-auditoriums or leisure areas.
Fayetteville High School benefits from an abundance of daylight and delivers innovative learning areas that compel the next generation to envision solutions for today’s and tomorrow’s challenges.


Design highlights

The new school was built upon the foundations of the original building as a tribute to the institution's heritage and to retain its desirable location. The facility also managed to create a new connection to the local landscape by creating a natural link between the building and the outside area. 


Kawneer provides reliability with versatile features

The school’s interior is illuminated by 28,000-square-feet of curtain wall and 14,000-square-feet of storefront glass, delivering an unobstructed, breezy design that provides a healthy environment for students and teachers.
Kawneer’s 1600 Wall System®1 Curtain Wall was installed with four rows of Versoleil® SunShade and Trifab® VersaGlaze® 451T Stick Framing System. 

Curtain Wall

The main entrance was repositioned to create a more inviting, visible entry into the high school, and the open floor plan allows more daylight to come inside, creating a brighter and more inspirational atmosphere throughout the renovated building. Another prominent design feature is the large southward-facing windows overlooking a landscaped student commons area, which create a collegiate campus feel reflective of the school’s ties to the University of Arkansas. Other sustainable features - including the use of recycled building materials and energy-efficient environmental-control systems - contributed to LEED Gold® certification of the building.

350 Medium and 500 Wild Stile Standard Entrances

The architects strategically installed skylights and vertical windows within the deep floor plates, flooding the windowless internal areas with daylight. 


The challenge

The architects faced many challenges throughout the building’s construction. The whole project took four years to be completed and was done while the school was operating. Additionally, the project involved construction, demolitions and renovations, demanding several building techniques and machinery used in many structures around the campus.


The solution

The modernization was completed in a phased approach to minimize disruptions to the school's routine. Most demolitions were carried out during the summer break to keep teachers and students safe. 
Despite being seamlessly integrated with the surroundings, the new school has a distinctive identity that is welcoming and modern at the same time. 

Find out more at Kawneer.com.

 

PROJECT INFORMATION:
Building
: Fayetteville High School
Location: Arkansas
Architects:
Hight Jackson Associates, Rogers, AR
Marlon Blackwell Architects, Fayetteville, AR
DLR Group, Overland Park, KS
General Contractor: Nabholz Construction Corp., Rogers, AR
Glazing Contractor: ACE Glass Construction, Little Rock, AR


PRODUCTS USED:

  • 1600 Wall System®1 Curtain Wall
  • 350 Medium Stile Standard Entrance
  • Trifab® VersaGlaze® 451T Stick Framing System
  • Trifab® VersaGlaze® 451T SS Framing System
  • 1010 Sliding Mall Front
  • Versoleil® SunShade - Outrigger System - for Curtain Wall 

Related Stories

| Jun 23, 2014

Firestone Building Products reveals 2014 Red Shield Metal Wall Systems certified contractors

Twenty-five top-performing firms honored as certified contractors.

| Jun 11, 2014

Koolhaas’ OMA teams with chemical company to study link between color and economy

Dutch company AkzoNobel is partnering with Rem Koolhaas' firm OMA to study how the application of colorful paints and coatings can affect a city's economic development.

Sponsored | | Mar 25, 2014

Johns Hopkins chooses SLENDERWALL for a critical medical facility reconstruction

After decades of wear, the hand-laid brick envelope of the Johns Hopkins nine-story Nelson/Harvey inpatient facility began failing. SLENDERWALL met the requirements for renovation.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 7, 2014

Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]

The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.

| Mar 4, 2014

How EIFS came to America

Design experts from Hoffmann Architects offer a brief history of exterior insulation and finish systems in the U.S.

| Feb 5, 2014

CENTRIA Redefines Coating System with Versacor® Elite

The Versacor Elite Coating System is a premium metal coating system that provides the highest level of protection in the harshest climatic or environmental conditions.

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 7, 2014

Concrete solutions: 9 innovations for a construction essential

BD+C editors offer a roundup of new products and case studies that represent the latest breakthroughs in concrete technology.

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021