Naomi’s Way, a 12-unit shelter in New Brunswick, N.J., had been providing transitional housing for special-needs single homeless women and their children.
About a year ago, Catholic Charities, Diocese of Metuchen, N.J., which operates Naomi’s Way, decided to convert the building to permanent housing. But it only had about $100,000 for much-needed renovations, and its initial plan was limited to redoing the kitchens in each apartment and making other, cosmetic changes, like replacing sliding closet doors with doors that swung open.
All-Phase Consulting Services, a general contractor in Perth Amboy, N.J., was hired to do most of that work.
Then the scope of the project broadened dramatically, thanks to the involvement of American Standard, the plumbing brand of Lixil, whose corporate headquarters is in nearby Piscataway, N.J.
American Standard donated in excess of $100,000 in products—including faucets, fixtures, and vanities—and remodeling costs, which allowed Catholic Charities to gut and redo each apartment’s bathroom. Then Philips, based in Somerset, N.J., donated all of the LED light fixtures. Leviton, which is based in Melville, N.Y., donated the switch/light outlet covers and AFCI outlets.
Fifty-five employees from American Standard and Philips volunteered to paint the apartments over a five-day period. Sherwin-Williams’ retail store in North Brunswick, N.J. donated the paint.
This corporate largesse “kind of turned this into a full-building renovation,” says Richard Matarangelo, Catholic Charities’ Facilities Maintenance Manager, who is supervising this project. He was able to replace the windows in the bathrooms with energy efficient windows with frosted glass, supplied by Silver Line Building Products, which is based in North Brunswick Township, N.J.
Richard Matarangelo, facilities maintenance manager for Catholic Charities, Diocese of Metuchen, N.J., who is supervising the renovation of Naomi's Way to become permanent affordable housing. Image: BD+C
During the renovation, some residents who had been living at Naomi’s Way were relocated to one of Catholic Charities’ other shelter. (Statewide, Catholic Charities operates about 30 buildings with around 100 apartments.)
Naomi’s Way’s renovation is scheduled for completion on July 1.
Each apartment is getting new kitchen cabinets, faucets, and sinks. Some will also get new appliances. Image: BD+C
Related Stories
| Dec 7, 2010
Prospects for multifamily sector improve greatly
The multifamily sector is showing signs of a real recovery, with nearly 22,000 new apartment units delivered to the market. Net absorption in the third quarter surged by 94,000 units, dropping the national vacancy rate from 7.8% to 7.1%, one of the largest quarterly drops on record, and rents increased for the second quarter in a row.
| Nov 3, 2010
Senior housing will be affordable, sustainable
Horizons at Morgan Hill, a 49-unit affordable senior housing community in Morgan Hill, Calif., was designed by KTGY Group and developed by Urban Housing Communities. The $21.2 million, three-story building will offer 36 one-bed/bath units (773 sf) and 13 two-bed/bath units (1,025 sf) on a 2.6-acre site.
| Nov 3, 2010
Rotating atriums give Riyadh’s first Hilton an unusual twist
Goettsch Partners, in collaboration with Omrania & Associates (architect of record) and David Wrenn Interiors (interior designer), is serving as design architect for the five-star, 900-key Hilton Riyadh.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 13, 2010
Apartment complex will offer affordable green housing
Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.
| Oct 13, 2010
Residences bring students, faculty together in the Middle East
A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.
| Oct 12, 2010
The Watch Factory, Waltham, Mass.
27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.