Anchored in the heart of a small rural community, Poettker Construction’s new headquarters stemmed from a 2016 strategic planning session to grow the company’s brand and retain talent.
The company, which over the previous decade had experienced significant expansion, was looking to bring together internal departments that were spread over five buildings, and to add far more collaborative spaces.
The concept from the project’s design architect Oculus Inc. was a historic German bank barn, which are barns built into a bank or hillside. That idea resonated with Poettker Construction, which served as this project’s owner and design-build leader. Oculus Inc. shared its Revit models to illustrate its vision, and created a 3D virtual reality presentation of the new headquarters to show at the groundbreaking ceremony.
The interior design included glassed-enclosed private spaces that allow for intimate collaboration. Image: Joe Dietrich
Fitting the building’s height—which boasts a 37-ft-high interior ceiling—within the context of an adjacent residential neighborhood and the architectural style of the traditional bank barn was creatively addressed by working with the topography of the site.
Energy efficiency is a signature feature of this headquarters. The owner’s goal was to reduce the building’s energy consumption by 75% and its carbon footprint by 65%. To abet that goal, the building’s design called for the addition of a solar farm and LED lighting throughout, as well as fluid application of a vapor barrier onto the building’s envelope.
Another key element was a geothermal heating and cooling system, utilizing the lake on premises as well as wells drilled 300 ft deep.
The headquarters’ exterior façade, with steel and glulam structural features, complements the owner’s diverse construction portfolio, and the materials used allowed for unique framing configurations.
Steel and glulam are the prominent materials used on the building’s façade. Image; Joe Dietrich
The interior design was informed by extensive interviews with management and department heads. The cubicles are tailored to a 21st-century environment with sit-to-stand workstations and open collaboration spaces. Other tech features include an in-house training room that can accommodate seminars, meetings, and learning opportunities for up to 100 people. Connections to facilitate internal and external interactions among departments and clients made working at home easier during the coronavirus pandemic.
The design had to address privacy concerns for departments like accounting and human resources, which are now hosted on the building’s mezzanine level next to Poettker’s executive offices. The mezzanine overlooks the company’s operations department, so the designers installed acoustical ceiling clouds above the accounting department to dampen the sound transfer between levels.
A large lobby and reception area lead to stairs that connect the building’s two work areas. Image: Alise O'Brien
On-site health and wellness amenities include a 24-7 private fitness center for staff, and a 3.5-acre outdoor sanctuary with a lake, waterfall, and landscaping that lead to a walking path.
The headquarters, which opened in October 2019, hosts events to engage and interest people of all ages in the construction industry. Last year, over 200 college and high school students took part in workforce and informational tours of the building.
The headquarters premises include an outdoor sanctuary with a lake, fountains, and walking paths. Image: Joe Dietrich
Submitting firm, Architect and Project manager: Oculus Inc.
Owner/developer and GC/CM: Poettker Construction
Structural Engineer: IMEG Corp.
MEP Engineer: BRiC Partnership
Size: 39,400 sf
Construction time: July 2018 to September 2019
Cost: NA
Delivery method: Design/Build
Photo credit: Alise O’Brien Photography
Related Stories
| Aug 11, 2010
Two Rivers Marketing: Industrial connection
It was supposed to be the perfect new office. In July 2003, Two Rivers Marketing Group of Des Moines, Iowa, began working with Shiffler Associates Architects on a 14,000-sf building to house their rapidly growing marketing firm. Over the next six months they put together an innovative program that drew on unprecedented amounts of employee feedback.
| Aug 11, 2010
AIA Course: Enclosure strategies for better buildings
Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.
| Aug 11, 2010
Glass Wall Systems Open Up Closed Spaces
Sectioning off large open spaces without making everything feel closed off was the challenge faced by two very different projects—one an upscale food market in Napa Valley, the other a corporate office in Southern California. Movable glass wall systems proved to be the solution in both projects.
| Aug 11, 2010
Silver Award: Pere Marquette Depot Bay City, Mich.
For 38 years, the Pere Marquette Depot sat boarded up, broken down, and fire damaged. The Prairie-style building, with its distinctive orange iron-brick walls, was once the elegant Bay City, Mich., train station. The facility, which opened in 1904, served the Flint and Pere Marquette Railroad Company when the area was the epicenter of lumber processing for the shipbuilding and kit homebuilding ...
| Aug 11, 2010
Special Recognition: Durrant Group Headquarters, Dubuque, Iowa
Architecture firm Durrant Group used the redesign of its $3.7 million headquarters building as a way to showcase the firm's creativity, design talent, and technical expertise as well as to create a laboratory for experimentation and education. The Dubuque, Iowa, firm's stated desire was to set a high sustainability standard for both itself and its clients by recycling a 22,890-sf downtown buil...
| Aug 11, 2010
Thrown For a Loop in China
While the Bird's Nest and Water Cube captured all the TV coverage during the Beijing Olympics in August, the Rem Koolhaas-designed CCTV Headquarters in Beijing—known as the “Drunken Towers” or “Big Shorts,” for its unusual shape—is certain to steal the show when it opens next year.
| Aug 11, 2010
Top of the rock—Observation deck at Rockefeller Center
Opened in 1933, the observation deck at Rockefeller Center was designed to evoke the elegant promenades found on the period's luxury transatlantic liners—only with views of the city's skyline instead of the ocean. In 1986 this cultural landmark was closed to the public and sat unused for almost two decades.
| Aug 11, 2010
200 Fillmore
Built in 1963, the 32,000-sf 200 Fillmore building in Denver housed office and retail in a drab, outdated, and energy-splurging shell—a “style” made doubly disastrous by 200 Fillmore's function as the backdrop for a popular public plaza and outdoor café called “The Beach.
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.
| Aug 11, 2010
Inspiring Offices: Office Design That Drives Creativity
Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.