Fifty-eight percent of contractors say they are having trouble finishing projects on deadline, according to the National Association of Home Builders.1
“It’s an issue with everyone I know,” said Richard, general manager of a mid-size building construction contractor. “We used to build a house in 90 days. Now our timeline is pushed out to 180.”
The result is shrinking margins. The longer your timeline, the more chances there are for cost overruns and uncertainties to creep into your project, potentially squeezing companies when they can least afford it.
58% of contractors say they are having trouble finishing projects on deadline1
“We’re in an industry where net income as a percent of revenue is not high compared to a lot of other industries,” said Barry, the president of a private home building company that does about $50 million in annual revenue. “We need to be smarter than ever to make our numbers.”
The culprit behind shrinking margins in the construction industry is, ironically, the rebounding economy. Dropping unemployment rates have led to a lack of skilled labor. Without enough construction workers to lay foundations, frame houses, and do finishing work, jobs are taking longer to complete. But an unexpected challenge demands a different kind of solution, one that allows construction companies to ease financial pressure without compromising the quality of projects.
Here are three ideas for protecting your margins in a tough market.
Get Strategic About Purchasing
Giving yourself the ability to quickly pull the trigger on purchases in time-sensitive situations can help keep profit margins healthy and your project on schedule.
Frequently, construction firms are also able to get great time-sensitive discounts when they’ve made bulk purchases.
Jumping on these types of opportunities, however, can require significant expenditures at a moment’s notice. Having a corporate card program backing up your business is crucial, so you can move quickly.
The key to keeping your cash flow positive in shifting circumstances is flexibility.
Similarly, strategically timing purchases to ensure that you’re not financing projects for owners will limit the amount that delays eat into your profit margins. “If I’m being delayed on a job because of weather, my bills are still rolling in,” said Joe.
The job site is never a static place. Things are changing constantly, and new challenges are always arising. The key to keeping your cash flow positive in shifting circumstances is flexibility.
Centralize and Digitize Your Expenses
Runaway expenses can take a big bite out of your profit margins. Loose cash almost always saps profits. It’s hard to account for and is time-consuming to track.
As a result, project managers and superintendents are increasingly looking to centralize their billing structures to create efficiencies and eliminate as much paper as possible. The more paper floating about, the more likely it is that information is being lostor seen out of context. Central offices want the ability to see the combined spending in one spot.
Additionally, centralizing your billing helps with post-project analysis. Applying the lessons learned from spending and expenses on one project helps to forecast the next project much more accurately.
Applying the lessons learned from spending and expenses on one project helps to forecast the next project much more accurately.
This is particularly relevant for firms that operate in multiple states. They often need custom financial solutions that are tailored to their ongoing project needs.
“Controlling costs by knowing what the spend is going to be every day can make the difference in knowing whether a job is going to be profitable --- or not,” said Richard.
Take Advantage of Rewards
In the construction business, taking advantage of every tool at your disposal to ease the squeeze on your margins is just good business sense. This is why a robust rewards program is increasingly attractive to contractors and firms.*
“Frankly,” said home building company president Barry, “we’re looking to save money wherever we can.”
That’s why most of the small private builders Barry knows take advantage of business credit card rewards programs by plowing those rewards straight back into the business.* After all, gaining a percentage point on thin profit margins, can make a difference to your bottom line.
1National Association of Home Builders, "More Builders Report Labor/Subcontractor Shortages"
Related Stories
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics
Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.
| Aug 11, 2010
Three Opus Corporation companies file for bankruptcy
Opus Corporation, a developer headquartered in Minnetonka, Minn., filed for bankruptcy in three of its five regional operating companies: Opus East, Opus South, and Opus West. CEO Mark Rauenhorst said sharp declines in commercial real estate values and tight credit markets caused difficulties in refinancing assets and restructuring lending agreements.
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +
| Aug 11, 2010
Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report
A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants
| Aug 11, 2010
Report: Building codes and regulations impede progress toward uber-green buildings
The enthusiasm for super green Living Buildings continues unabated, but a key stumbling block to the growth of this highest level of green building performance is an existing set of codes and regulations. A new report by the Cascadia Region Green Building Council entitled "Code, Regulatory and Systemic Barriers Affecting Living Building Projects" presents a case for fundamental reassessment of building codes.
| Aug 11, 2010
Call for entries: Building enclosure design awards
The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.
| Aug 11, 2010
Portland Cement Association offers blast resistant design guide for reinforced concrete structures
Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads. It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.