flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hill International Selected as Project Manager for Abu Dhabi Future School Program

Hill International Selected as Project Manager for Abu Dhabi Future School Program


By Posted by Raissa Rocha, Associate Editor | June 22, 2012

Hill International announced it has been awarded a contract by the Abu Dhabi General Services Co. (Musanada) to provide project management services in connection with the Abu Dhabi Future School Program. The 14-month contract has an estimated value of approximately $3.6 million.

Hill's services include managing the construction of ten new schools in the United Arab Emirates, five in Abu Dhabi and five in Al Ain. The estimated construction cost for the ten schools is estimated at approximately $327 million.

"The Abu Dhabi Future School Program is an extremely important initiative for the Emirate and for its children," said Mohammed Al Rais, senior vice president and managing director (Middle East) for Hill's project management group. "We are proud to be part of a program that will have such a positive impact.”

"Musanada's Building Services is delighted to offer Hill International its support. This type of coordination is in line with Musanada's commitment to ensure that all government schools across the capital are provided with world-class, cost-effective services that will support them in serving the people of Abu Dhabi more effectively," said Musanada's CEO, H.E. Mohamed Khalifa Al Fahed Al Mehairi.

Related Stories

K-12 Schools | Jan 24, 2018

Hawaii’s first net-zero public school

G70 is the architect, planner, and civil engineer of record for the project.

K-12 Schools | Jan 22, 2018

Innovative learning environments and our ‘Heschong Mahone moment’

An education market think tank proposes a radical research concept for evaluating learning environments.

K-12 Schools | Dec 6, 2017

Designing K-12 schools from the inside out

A step-by-step process finds better answers, saves money, and produces measurable results.

K-12 Schools | Nov 16, 2017

Future-proofing higher education: Understanding generation Z

There are three driving issues behind this next generation: demographic change, behavioral change, and the power to choose.

Engineers | Nov 2, 2017

CannonDesign expands its presence in Colorado with BWG acquisition

Future mergers could be in the offing.

K-12 Schools | Oct 31, 2017

Exploring empathy in architecture: Put yourself in your student’s shoes

People are enigmatic and inherently complex, which can make it difficult to design for a larger population.

K-12 Schools | Oct 28, 2017

A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

The building’s programming will provide more access to the community at large. 

Higher Education | Oct 26, 2017

Where campus meets corporate design

A building is much more than its appearance; it’s how the user will behave inside of it that determines its adaptability.

Giants 400 | Oct 9, 2017

Job-ready learning: The newest K-12 schools nudge students toward careers

Some long-term K-12 trends—like beefing up safety and security, and designing for more natural light and outdoor learning space—are still in vogue.

Giants 400 | Oct 9, 2017

Top 80 K-12 construction firms

Gilbane Building Co., Balfour Beatty US, and Skanska USA top BD+C’s ranking of the nation’s largest K-12 sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

boombox1 - default
boombox2 -
native1 -

More In Category

K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021