flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

High-rise Construction

A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

Sculptor David Černý and architect Tomáš Císař from the studio Black n´ Arch designed the project.


By David Malone, Associate Editor | October 7, 2019
Top Tower as seen from the street

All renderings courtesy Trigema

At approximately 443-feet-tall, Top Tower would become the tallest building in Prague. And while, especially in today’s world of Supertalls closing in on 2,000 feet, the height may not seem too impressive, another element of the proposed building would serve to make it one of the most unique buildings in the world: a giant sculpture of a shipwreck that rises the length of the building (and beyond).

Designed by sculptor David Černý and architect Tomáš Císař from the studio Black n´ Arch for developer Trigema, Top Tower looks like it would be more at home in the world of Mad Max than Prague’s new pedestrian zone. The LEED Gold targeted building will feature rental housing with offices on the lower floors. Retail shops will be located on the first and second floors with public parking underground. A multifunctional cultural center connects to a publicly accessible roof garden.

 

Top Tower propeller sculpture

 

The shipwreck sculpture is meant as a warning to unchecked climate change, evoking a vision of a post-apocalyptic future. The bright red sculpture rises vertically with the building, culminating just above the roof garden. Here, accessible by ski lift, the sculpture becomes the tallest viewing deck in Prague, providing views of nearly the entire perimeter of the City.

 

See Also: KPF-designed CITIC tower is Beijing’s tallest

 

Top Tower viewing deck

 

Top Tower also includes the revitalization of the public pedestrian zone between the entrances and exits of the Nové Butovice metro station. Trigema is hoping to begin construction on the tower in 2021 and expects construction to take fewer than three years.

 

Top Tower sculpture at night

 

Related Stories

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021