flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Frank Gehry's $100 million Eisenhower Memorial gets preliminary approval

Frank Gehry's $100 million Eisenhower Memorial gets preliminary approval

According to the Los Angeles Times, members of the Eisenhower family have expressed strong disapproval of the design.


By BD+C Staff | October 6, 2014

After a rejection earlier in the year, Frank Gehry has gotten some good news: his revised design for the Dwight D. Eisenhower Memorial, located in Washington, D.C., has received preliminary approval. 

The National Capital Planning Commission voted 10-1 to approve the revision, according to Architecture Lab. The same commission rejected Gehry's original proposal months ago, citing concerns about the large metal tapestries proposed by the architect and how they would affect the view to and from Capitol Hill. 

In September, Gehry unveiled the new design, with the metal tapestries removed along with other changes. After the approval, Gehry said in a statement: "I'm grateful to the National Capital Planning Commission for its decision, and for its cooperative engagement in resolving the issues."

According to the Los Angeles Times, members of the Eisenhower family have expressed strong disapproval of the design, even the revised version. 

The memorial must go through other levels of approval before it is finalized, including funding approval from Congress; the estimated cost of construction is over $100 million.

The revised design addresses several concerns raised during the NCPC meeting earlier this year:
• The design revisions eliminate the East and West Tapestries, allowing the influence of the adjacent buildings to define and unify the site.
• The northern singular columns are set back more than 47 feet from the Independence Avenue Right-of-Way and are fully within the planes of the adjacent building facades.
• The revised design has widened the Maryland Avenue view corridor from 95 feet to 135 feet. This creates a more proportionally horizontal framing of the U.S. Capitol.
• Original concept included four columns that were within the 160-foot right of way. With the elimination of the side tapestries, the revised plan now includes only two columns within the southern edge of 160-foot right of way.

Related Stories

Cultural Facilities | Dec 4, 2019

Snøhetta wins competition to design maritime center in Esbjerg, Denmark

The project’s design was developed with WERK Arkitekter.

Cultural Facilities | Dec 1, 2019

Small-venue theaters play starring cultural and economic roles in New York City’s economy

A new study identifies the challenges these theaters face, and offers possible solutions that include more city support.

Cultural Facilities | Nov 11, 2019

‘The Whale’ will be an arctic attraction 185 miles north of the Arctic Circle

Dorte Mandrup won an international competition to design the project.

Cultural Facilities | Oct 29, 2019

A watchtower in Harlem, once a firefighter’s lookout, is restored as a landmark

The nearly $8 million project required major structural interventions.

Giants 400 | Oct 3, 2019

Top 65 Cultural Sector Construction Firms for 2019

Whiting-Turner, Turner, PCL, Clark Group, and Gilbane top the rankings of the nation's largest cultural facility sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

Top 70 Cultural Sector Engineering Firms for 2019

Jacobs, Arup, EXP, BRPH, and Thornton Tomasetti head the rankings of the nation's largest cultural facility sector engineering and engineering architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

Top 110 Cultural Sector Architecture Firms for 2019

Gensler, Populous, DLR Group, Stantec, and Perkins and Will top the rankings of the nation's largest cultural facility sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

2019 Cultural Facility Giants Report: New libraries are all about community

The future of libraries is less about being quiet and more about hands-on learning and face-to-face interactions. This and more cultural sector trends from BD+C's 2019 Giants 300 Report.

Cultural Facilities | Sep 11, 2019

The Kennedy Center expands for the first time since its 1971 debut

The REACH, with three pavilions on a generous lawn, adds openness and light to this performance space.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021