Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

Sponsored Content Fire-Rated Products

Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

SaftiFirst’s custom curtain wall complied with all the seismic requirements while still blending in seamlessly with building’s design


By SaftiFirst | March 7, 2016

Project Name: San Jose Downtown Health Center in San Jose, CA
Architect:
Ratcliff
General Contractor: Flint Builders
Glazing Contractor: Montez Glass
Products:  SuperLite II-XL 60 insulated with Solarban 70XL in GPX Curtain Wall Framing (exterior); SuperLite II-XL 60 in GPX Architectural Series Walls and GPX Builders Series Temperature Rise Doors (interior) 

California has a long history of experiencing major, catastrophic earthquakes, and is predicted to experience more in the future.  According to the Office of Statewide Health and Planning’s (OSHPD) report on California’s Hospital Seismic Safety Law, a moderately strong earthquake (6.0 to 6.9 magnitude) occurs in the state every two to three years.  Since it is not a question of “if” but rather “when” the next major earthquake will occur, California now has stricter seismic requirements in the building code, with special requirements for critical facilities that need extra protection.

In 1973, the legislature passed the Alfred E. Alquist Hospital Seismic Safety Act, which required acute care hospitals to be designed and constructed to withstand a major earthquake and remain operational immediately after.  However, the 1994 Northridge earthquake (with a 6.7 magnitude) revealed that many hospital buildings performed poorly. This led to the passage of Senate Bill (SB) 1953, which amended the Alquist Act to require hospitals to evaluate their general acute care building for seismic resistance based on the standards set by OSHPD. 

How have some hospitals complied with SB 1953?  In 2008, Santa Clara Country proposed Measure A, which would allocate $50M towards funding a new facility to replace the old San Jose Medical Center that was shut down in 2004 due to rising operational costs and a mandated seismic retrofit, which would have cost hundreds of millions of dollars.  Measure A passed without opposition in 2012, and groundbreaking on the construction of a modern, seismically fit San Jose Downtown Health Center began soon after. 

Ratcliff was chosen as the architect to design the new three-story, 60,000 square foot facility that includes urgent care for adults and children, primary care for pediatric, OB/GYN and family medicine, behavioral health services, laboratory, pharmacy and radiology departments. Their design takes advantage of glazing’s ability to draw natural light from the outdoors to achieve LEED Gold Certification. The abundance of natural light also creates a warm, pleasing atmosphere that promotes healing and reduces anxieties often associated with medical visits. 

Part of the hospital’s exterior curtain wall had to be fire rated for one hour.  To keep the transparent look, the architects specified a one hour fire resistive curtain wall with SuperLite II-XL 60 insulated with Solarban 70XL in GPX Curtain Wall framing to meet the design, energy and fire requirements.  The fire resistive curtain wall was supplied with custom extrusions to match the system depth and finish of the adjacent non-rated curtain wall for a uniform, seamless look. 

To comply with seismic requirements, the engineers at SAFTI FIRST worked with the building team to provide a custom fire resistive curtain wall system that allowed for deflection and story-drift movement specifically designed to work in concert with the adjacent non-rated curtain wall.  This was to ensure that in the event of an earthquake, both systems would work together and remain intact, thus allowing the hospital to remain fully functional.  

Another concern was providing safe paths of egress in case the earthquake triggers a fire in the hospital.  One hour rated egress stairways are on both sides of the building.  To keep the light-filled transparent look throughout the building, the architects used SuperLite II-XL 60 in GPX Architectural Series Framing.  For maximum vision, the architects also used SuperLite II-XL 60 in GPX Builders Series Temperature Rise Door Framing in order to exceed the otherwise 100 sq. in. code limitation imposed on fire protective glass (such as wired glass, ceramics, etc.). in the door vision panels.  This fire resistive door and wall assembly gives one-hour of full protection from smoke, flames and radiant heat, which allows patients and staff to exit safety or provide a safe haven as they await rescue.

The result is a beautiful, modern health center that will bring much needed services to the community for many years to come.  The new San Jose Downtown Health Center is scheduled to open its doors to the public in 2016.

Related Stories

Resiliency | Nov 8, 2022

Oregon wildfire risk law prompts extensive backlash from property owners

A bipartisan bill aimed at protecting property owners from wildfires that was passed by the Oregon legislature has prompted a strong backlash.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

Fire-Rated Products | Oct 21, 2021

Safti First Fights Through Assertions Made By Plaintiffs Ely Holdings Limited And Greenlite Glass Systems That Safti First’s Fire Rated Floor System Infringed On Their Patent

In a summary judgement dated February 3, 2021, Chief Magistrate Joseph C. Spero of the United States District Court for the Northern District of California ruled that the patent infringement claims filed by Ely Holdings Limited (Ely) and Greenlite Glass Systems (Greenlite) against SAFTI FIRST, a USA fire rated glass and framing manufacturer, could not proceed to trial, finding that the SAFTI FIRST’s fire resistant floor does not violate Ely’s patent.

Multifamily Housing | Feb 10, 2021

The Weekly show, Feb 11, 2021: Advances in fire protection engineering, and installing EV ports in multifamily housing

This week on The Weekly show, BD+C editors speak with AEC industry leaders from Bozzuto Management Company and Goldman Copeland about advice on installing EV ports in multifamily housing, and advances in fire protection engineering.

Building Materials | Jul 5, 2020

A new report predicts significant demand growth for mass timber components

There should be plenty of wood, but production capacity needs to catch up.

75 Top Building Products | Dec 16, 2019

Top Structural Products for 2019

Inpro’s Fireline 140 fire barrier and Owens Corning’s Foamglas cellular glass insulation are among the 10 structural products to make Building Design+Construction's 2019 101 Top Products report.

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

Sponsored | Fire-Rated Products | Aug 28, 2018

Fire rated glazing gets visitors ‘in the spirit’ of historic bourbon distillery

Project Name: Old Forester Distillery in Louisville, KYArchitect: Bravura ArchitectsGlazing Contractor: Kentucky Mirror and Plate Glass Co.Products used: SuperLite II-XL 60 in GPX Architectural Series Walls; SuperLite II-XL 60and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Doors 

Sponsored | | May 24, 2018

Accelerate Live! sponsor talk: The impact of new fire rated glazing technologies to design, performance, and the environment

In this 10-minute sponsor talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Tim Nass, VP of Sales with SAFTI FIRST Fire Rated Glazing Solutions, details emerging applications for fire rated glazing technology.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021