flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.


By By Robert Cassidy | September 26, 2012

The November issue of Building Design+Construction will feature a “progress report on sustainable design and construction” with a look to the top projects in key green building categories – and how AEC firms are keeping on top of sustainability issues.

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

Please respond to Rob Cassidy, Editorial Director: rcassidy@sgcmail.com, or 847-391-1040. We need to hear from you by Friday, Oct. 5, 2012.

Tell us what your firm is doing in sustainability that’s fresh and innovative: Using propriety environmental software? Energy modeling? Strategic planning around sustainability? Advocacy? New “green” building materials? Renewables? Net-zero? Living Buildings? Performance measurement? Human/social benefit of green building? Meeting heightened client demands for sustainability? Overcoming cost or regulatory barriers? Going beyond “point counting”? Marketing green?

Send us press releases, photo/s or renderings (low-res), PDFs, etc. – about your firm’s recent green projects (last 12-18 months).Projects could fall into several areas: LEED (minimum Gold or Platinum), Green Globes, CHPS, Living Building Challenge, Zero/Net-Zero Energy/Water/Waste, etc. – for New Construction, Renovation, Existing Buildings, Commercial Interiors, etc.
We are particularly interested in projects in the following categories:

  • Healthcare Facilities (hospitals, EDs, MOBs, outpatient, specialty facilities)
  • K-12 Schools (public, private, charter, Pre-K too)
  • University Projects (residence halls, student unions, classroom buildings, S+T, etc.)
  • Office Buildings (new, reconstructed – major fitouts)
  • Reconstruction Projects (historic preservation, adaptive reuse, reconstruction with addition, major renovations and fitouts)
  • Hotel/Hospitality/Restaurant Projects
  • Retail Projects (mixed-use, malls, shopping centers, stores)
  • Government Buildings (Fed, State, Local)
  • Multifamily (rental apartment, condo, townhouse complex – no single-family)
  • Military Projects (base facilities, offices, base Xchange, etc.)
  • Data Centers and Mission-Critical Facilities
  • BIM/VDC/CAD-based Projects that are also sustainably designed (did BIM help?)

Who is the key “sustainability” expert at your firm? (Name, title, contact info)

Thanks, and we look forward to working with you on this exciting issue of BD+C! +

Related Stories

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Charlotte's new multifamily mid-rise will feature exposed mass timber

Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.


Construction Costs

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021