flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Duro-Last provides solution for Kentucky elementary school's leaky roof

Sponsored Content Roofing

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 


By Duro-Last | March 21, 2017

Contractor: JBK Roofing

Project: Lynn Camp Elementary School

Location: Corbin, Kentucky

Square Feet: 119,000

Products: Duro-Fleece®, Duro-Tuff® and Duro-Last® membranes; Vinyl Ribs; Duro-Guard® EPS Flute Fill Combo insulation; Duro-Guard ISO HD insulation, Duro-Guard DensDeck® cover boards, EXCEPTIONAL® Metals accessories and edge details, Duro-Grip® CR-20 adhesive; Duro-Caulk® Advanced

 

 

When roof leaks were starting to interfere with the daily activities of Lynn Camp Elementary School in Corbin, Kentucky, administrators knew it was time for a new roof.

“We had a situation in a lot of the rooms where tiles were molding because of the roof leaks,” said Anthony Pennington, Principal of Lynn Camp Schools. “It was becoming a constant distraction for not only our students but our teachers and their learning process.”

The existing standing seam metal section of the roof was a daunting task at more than 78,000 square feet, but its design and blue color was a look the school was hoping to maintain. However, the projected timeline to complete a metal roof of this size would be 9-12 months, well outside the school’s needs.

Time was of the essence for this project and when JBK Roofing presented a metal retrofit option using the Duro-Last Vinyl Rib system, school administrators knew they had found the right solution.

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. Duro-Fleece 50 mil membrane was adhered with Duro-Grip CR-20 adhesive and, lastly, the Vinyl Ribs were heat welded to the adhered membrane.

Being such a large roof, more than 52,000 liner feet of Vinyl Rib was used.

“This is by far the largest and most intense Vinyl Rib project we’ve done,” said Brandon Keck, President of JBK Roofing. “Even so, the Duro-Last system was extremely fast-paced and allowed us to fit in the school’s schedule, taking only 90 days to complete.”

The bright blue color of the Duro-Fleece membrane also gave the school the aesthetic look they wanted. “We wanted something cutting edge, we wanted something that would last a long time and would look amazing for our school,” Pennington said.

Related Stories

Sponsored | Roofing | Oct 24, 2016

Metal roofing panels reinvigorate town staple

Designers for the project initially thought patching and repairs would be sufficient for the 35-year-old, 17,000 square foot roof, however upon further inspection it was determined that the building needed a new roof.

Roofing | Sep 30, 2016

A Florida-based roofing contractor mixes advocacy and philanthropy

The owner of Venture Construction Group says that caring for his father changed his perspective about work and life. 

Sponsored | Coatings | Sep 26, 2016

Valspar products at the forefront of innovation and sustainability

Fluropon SR and Fluropon Pure are two products that help Valspar cultivate a culture of innovation.

Sponsored | Roofing and Fire Safety | Sep 21, 2016

Metal roofing provides exceptional fire resistance

Buildings with great fire resistance will likely have lower insurance costs and be restricted by fewer codes, owing to the decreased risk. 

Sponsored | Energy Efficiency | Jul 27, 2016

Metal Roofs Have Solar Advantage

 A large roof can become a resource that saves significant money on energy consumption and helps reduce emissions of CO2 and it turns out metal roofs make excellent hosts for solar panels.

Sponsored | Roofing | Jun 29, 2016

Retrofit roofs instead of replacement

When faced with the need to replace a flat roof, many building owners find retrofitting a more viable investment, and so they erect a long-lasting, low-maintenance sloped metal roof.

Shopping Centers | Jun 3, 2016

Developer Robinsons Land adds powerful PV arrays to 10 malls in the Philippines

The Robinsons Starmills mall in San Fernando recently turned on a 2.9 megawatt rooftop PV plant.

Codes and Standards | May 19, 2016

Asphalt roofing group publishes updated shingle installation guide

Technical manual provides best practices for roofing professionals.  

Roofing | May 16, 2016

New guide focused on increasing energy and structural performance with raised-heel trusses

Higher trusses simplify attic ventilation, leave more space for insulation.  

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021