Chicago’s first citizenM hotel is set to rise as part of Sterling Bay’s mixed-use development at 300 North Michigan Avenue, located between the Riverwalk and Millenium Park.
The 47-story, 523-foot tower will include 289 residential units, 280 hotel rooms, and 25,000 sf of retail space. The ground floor retail will open directly to the street with the hotel and a terrace above. A subterranean, 22-parking-spot garage will also be included.
The 280 hotel rooms will feature XL king-sized beds, an HD TV with a library of on-demand movies and streaming options via free WiFi, a rain shower, and customizable room ambiance – the blinds, TV, and lights are all enabled to change colors – controlled by an iPad.
See Also: Over 400 micro units spread across two communities under development in Austin
The interior’s, designed by Amsterdam-based design firm Concrete, will be inspired by the local community and feature a mix of contemporary art, photography, and objects by local artists. Chicago’s bKL will serve as the lead architect. Once completed, a subsidiary of citizenM will acquire the hotel.
The citizenM Chicago project will join other citizenM projects currently under development in the U.S. in Miami, Los Angeles, San Francisco, Seattle, and Washington, D.C. Locations in Boston and New York have recently opened.
Related Stories
| Oct 6, 2010
From grocery store to culinary school
A former West Philadelphia supermarket is moving up the food chain, transitioning from grocery store to the Center for Culinary Enterprise, a business culinary training school.
| Sep 30, 2010
Luxury hotels lead industry in green accommodations
Results from the American Hotel & Lodging Association’s 2010 Lodging Survey showed that luxury and upper-upscale hotels are most likely to feature green amenities and earn green certifications. Results were tallied from 8,800 respondents, for a very respectable 18% response rate. Questions focused on 14 green-related categories, including allergy-free rooms, water-saving programs, energy management systems, recycling programs, green certification, and green renovation.
| Sep 13, 2010
Conquering a Mountain of Construction Challenges
Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.
| Aug 11, 2010
Accor North America launches green hotel pilot program
Accor North America, a division of Accor Hospitality, has announced that it will pilot the Green Key Eco-Rating Program within its portfolio in the United States in 2010. Green Key is the first program of its kind to rank, certify and inspect hotels and resorts based on their commitment to sustainable "green" practices; the Accor North America pilot will involve 20 properties.
| Aug 11, 2010
CTBUH changes height criteria; Burj Dubai height increases, others decrease
The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.
| Aug 11, 2010
Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms
A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
See what $3,000 a month will get you at Chicago’s Aqua Tower
Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.
| Aug 11, 2010
Architecture Billings Index flat in May, according to AIA
After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.