Autodesk media days: Suffolk Construction’s BIM story

April 22, 2011 |
Jeff Yoders

While it’s always nice to see what’s new in Revit 2012 (now with constructability tools!), some of the most valuable information editors and bloggers take from Autodesk’s annual media days in suburban Boston are the actual customer stories presented to the media.

This year’s best presentation was by Peter Campot, President of the Healthcare/Science and Technology division of New England’s Suffolk Construction. While describing his company’s journey from skepticism to full-adoption of BIM and the Revit platform, Campot showed examples of how his company benefited from BIM on large projects such as the Baystate Medical Center in Springfield, Mass., a $200 million, 638,000-sf replacement hospital, and the MIT Cancer Research Center, a $200 million, 500,000-sf project in Cambridge, Mass., completed in 2007.

The problem with today’s projects, Campot said, is that as buildings have become more complex, design detail has not.

“We need to transition from design as you go to a design and construction process,” Campot said.  “We reinvent the wheel everyday right now. Would you ride in an airplane that was a prototype? Buildings are the same way, each is a one-off, but if you build it virtually you’ll build it right.”

Campot said that general contractors and construction managers need to move beyond using BIM for just clash detection. To illustrate the point he showed how all the steel beams, with penetrations, were purchased and coordinated with the steel fabricator to beat a price increase and save $650,000 on the MIT Cancer Research Center. 85% piping and valve assemblies were fabricated off-site, saving over $100,000 in field labor and enhanced scheduling. Suffolk’s use of BIM reduced the number of RFIs on the project by 194. Campot said that translated into a total savings of 7,949 man-hours, for a total savings of $814,374.

“Value-engineering, I would argue, is neither,” Campot said. “If we get the construction model right there ARE no RFIs. Higher quality is what I care about. I’m in a reference business.”

He also said as the architects and designers produce better 3D models, the delivery and construction of buildings will get better and more efficient, but only if the entire Building Team buys into BIM.

“We need a paradigm shift,” Campot said. “We need to restructure and transform the industry. Owners have to be willing to spend more upfront. It does come back to them in the end.”

To date, Suffolk Construction has handed over 60 3D models to its clients. While Campot said the clients sometimes aren’t ready to use that information for facilities management, Suffolk still tags and highlights every piece of mechanical equipment in case they can be used for FM.

Suffolk is using BIM for every project valued at over $10 million it takes. The use at least clash detection on every project and recommend full BIM for every project over $50 million in estimated costs. The company uses 50 different 3D BIM software programs in-house and purchased all of its full-time employees iPads to use in the field last year.

Jeff Yoders | Building Team Blog

For five years Jeff Yoders covered IT, CAD, and BIM as Senior Associate Editor of Building Design + Construction. He's a chair at-large of the Associated General Contractors of America's BIM Forum and speaks regularly to audiences about how to transition to digital workflows. Jeff has won four American Society of Business Publications Editors awards.

Related Blogs

Photo: Mass Communications Specialist 1st Class Corey Lewis , U.S. Navy, via Wikimedia Commons; photo filter via BeFunky.com

May 31, 2016 | AEC Tech | Building Team Blog

As buildings become increasingly connected, opportunistic hackers have countless avenues into a building’s...

Lexus RX 450h self-driving car. Photo: Wikimedia Commons

May 09, 2016 | AEC Tech | Building Team Blog

Despite popular belief, the country is not in a great age of technological and digital innovation, at least...

Deep Learning + AI: How machines are becoming master problem solvers

The world’s top Go player Lee Sedol puts the first stone against Google’s artificial intelligence program AlphaGo during the third match of the Google DeepMind Challenge match in Seoul, South Korea. Photo: Reuters/Google/Yonhap

March 31, 2016 | AEC Tech | Building Team Blog

Besides revolutionary changes to the world’s workforce, artificial intelligence could have a profound impac...

Yotel, New York City. Photo: JasonParis, flickr creative commons

March 09, 2016 | Hotel Facilities | Building Team BlogRobert Cassidy, Executive Editor

Hotels are going for a new minimalist look to attract younger guests, but some older business travelers don...

Is the booming freelance economy a threat to AEC firms?

Photo: Pixabay

February 24, 2016 | Architects | Building Team Blog

By shifting the work (and revenue) to freelancers, “platform capitalism” startups have taken considerable m...

How the Fourth Industrial Revolution will alter the globe’s workforce

Photo: Pixabay

January 26, 2016 | BIM and Information Technology | Building Team Blog

The next great technological metamorphosis will be unlike anything humankind has experienced before, due to...

Potential vs. credential: How men and women differ in career progress

Courtesy Pixabay

January 05, 2016 | Architects | Building Team BlogDavid Barista, Editorial Director

Recent research suggests that women face yet another career impediment: the confidence gap.

Meet the world’s next great construction superpower

Photo: Wili Hybrid via Wikimedia Commons 

December 23, 2015 | Industry Research | Building Team Blog

There’s a new world construction hotbed coming down the pike (more specifically, the Mumbai Nashik Expressw...

Photo: Deskmag via Wikimedia Commons

December 02, 2015 | Building Team Blog

Researchers at Harvard, SUNY-Upstate Medical Center, and Syracuse University conduct a controlled experimen...

Leadership or limbo: Moving to building green’s next level

3 PNC Plaza. Photo: John Marino via flickr Creative Commons

November 29, 2015 | Green | Building Team Blog

After interviewing more than 50 AEC firms for our Greenbuild Report in the November issue, I wonder if the...

Add new comment

Your Information
Your Comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
Overlay Init