flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

AIA Committee on the Environment recognizes Top 10 Green Projects

Green

AIA Committee on the Environment recognizes Top 10 Green Projects

Seattle's Bullitt Center and the University Center at The New School are among AIA's top 10 green buildings for 2015.


By BD+C Staff | April 22, 2015
AIA Committee on the Environment recognizes Top 10 Green Projects

University Center, The New School, New York City. Image: James Ewing

The American Institute of Architects (AIA) and its Committee on the Environment (COTE) have selected the top 10 examples of sustainable architecture and ecological design projects that protect and enhance the environment. The projects will be honored at the AIA 2015 National Convention and Design Exposition in Atlanta.

The COTE Top Ten Awards program, now in its 19th year, is the profession's most rigorous recognition program for sustainable design excellence. The program celebrates projects that are the result of a thoroughly integrated approach to architecture, natural systems and technology. They make a positive contribution to their communities, improve comfort for building occupants and reduce environmental impacts through strategies such as reuse of existing structures, connection to transit systems, low-impact and regenerative site development, energy and water conservation, use of sustainable or renewable construction materials, and design that improves indoor air quality.

 

The Bullitt Center; Seattle
The Miller Hull Partnership

Image: Nic Lehoux

The Bullitt Center is a high performance urban office building demonstrating a commercially-viable structure with essentially no environmental footprint is possible; it is the largest certified Living Building. Performance metrics drove building design with every material and system in the self-sustaining six-story, 52,000-square-foot office building evaluated toward the goal of net zero energy, water, and waste—resulting in an unprecedented Energy Use Intensity (EUI) of 10kbtu/sf/yr. Sustainable design moves responding to regional context include operable floor-to-ceiling windows for daylight and fresh air, heavy-timber framing, a transparent ‘irresistible stair’ with dramatic views, and overhanging roof characteristic of Northwest design vernacular. A new paradigm for design, the building serves as a living laboratory for high-performance architecture and sustainability education seeking to influence the way society views the relationship of a building to its environment.

 

 

CANMET Materials Technology Laboratory; Hammilton, Ontario, Canada
Diamond Schmitt

Image: Elizabeth Gyde

This 174,300-sf lab and support office space incorporates a complex industrial program of pilot scale casting, rolling and welding, corrosion, and mechanical testing alongside microstructure evaluations and radiation testing. With over 800 customized pieces of equipment in addition to generic lab equipment CANMET is a complex energy use intensive building. The pursuit of LEED Platinum triggered a comprehensive Integrated Design Process (IDP), which was pivotal to the resulting design. A building charter targeted significant energy use reduction to exceed the 2030 Challenge and achieve a 70% energy use reduction, a goal that is particularly challenging for an industrial lab building.

 

 

Collaborative Life Sciences Building for OHSU, PSU & OSU; Portland, Ore.
SERA Architects

Image: Alene Davis Photography

Oregon Health & Science University, Portland State University, and Oregon State University partnered to create a new allied health, academic, and research building. Located on a former brownfield site constrained by adjacent roadway and bridge construction, the building is conceived as an innovative model of interdisciplinary health sciences education, research, and education. Interior glazed walls foster “research and teaching on display,” allowing occupants and pedestrians to view the activity in labs and classrooms.

The atrium offers dynamic connections between program elements through connecting bridges and informal study areas for students. As one of only two projects in the U.S. over a half million square feet that has been certified Platinum under the LEED NC v2009 rating system, this project incorporates a number of sustainable design innovations including: transformation of an existing brownfield, light pollution reduction, stormwater management, ecoroofs to reduce stormwater runoff, nonpotable water for toilet flushing, atrium heat recovery, and low ventilation fume hoods.

 

 

E+ // 226-232 Highland Street Townhouses; Boston
Interface Studio Architects (ISA) and Urbanica Design

Image: Sam Oberter

The project was conceived as a replicable prototype for family friendly, energy efficient, urban townhomes. Each unit is approximately 1850-square-feet, with flexible living areas, 3 bedrooms, and 2.5 bathrooms. The project was the first completed under the City of Boston’s Energy Plus (E+) Green Building Program, a pilot initiative to develop energy positive sustainable housing. The project team was chosen through a design competition organized by the Boston Redevelopment Authority (BRA) and the Department of Neighborhood Development. Incorporating both passive and active energy efficiency measures, the project has achieved HERS ratings between 6 and 9, and is certified LEED for Homes Platinum.

 

 

Hughes Warehouse Adaptive Reuse; San Antonio
Overland Partners

Image: AIA

This adaptive reuse project transforms an early 20th century warehouse into an innovative but functional studio space. The balance between maintaining the historic integrity of the building and improving energy efficiency was critical for the nearly 100-year-old building. As a result, the design team focused on preserving the open plan space and leaving interventions light in order to maximize flexibility of the space for future users as well as to encourage collaboration amongst staff and minimize material usage, achieved through the elimination of private offices. Though it decreased leasable square footage, the project’s newly inserted courtyard became integral to the design, providing a place for public life, improving daylighting, and decreasing the amount of conditioned space.

 

 

Military Medical Hospital; San Antonio
RTKL

Image: AIA

San Antonio Military Medical Center (SAMMC) is home to a world class burn treatment and recovery unit, and the design both accommodates this function and draws its architectural inspiration from it. A long trellis canopy spans the length of the south elevation, throwing dappled shade on the building and presenting the welcoming image of a large veranda. Under this umbrella, the footprint of the façade varies to break down the scale of a very long elevation while shading the building as the sun moves toward the west. Surfaces at the front edge have no fenestration, avoiding heat gain, while the surfaces at the back of the trellis are extensively glazed and shaded. These simple architectural gestures humanize the scale and image of the medical center while aiding environmental performance.

 

 

New Orleans BioInnovation Center (NOBIC); New Orleans
Eskew+Dumez+Ripple

Image: Timothy Hursley

The NOBIC, a LEED Gold research facility serves as an incubator for biotech startups, helping ideas conceived locally to become local jobs and industries. The facility includes a flexible 100 person conferencing center, breakout spaces, and a 2,000-sqaure-foot café. The design reinterprets vernacular regional climate responsive strategies—the slatted shutter, the landscaped courtyard water feature, the sheltered porch—to provide a facility that is both of its place and of its time. The facility captures rainwater and diffuses it to plants and soils on site, and is supplemented by the AC condensate (up to 20,000 gallons per week), which provides all landscape irrigation on site.

 

 

Sweetwater Spectrum Community; Sonoma, Calif.
Leddy Maytum Stacy Architects

Image: Tim Griffith

Sweetwater Spectrum is a new national model for supportive housing for adults with autism, offering life with purpose and dignity. The project includes four homes, a community center, therapy pools and urban farm. Practical sustainable design strategies promote health and wellness, reduce energy consumption, and offer multiple long term benefits to residents, staff, and the Sonoma community. The project is a Pacific Gas & Electric Zero Net Energy Pilot Project and exceeds the 2030 Commitment. A variety of passive and active strategies, including building orientation, high performance envelope, building integrated photovoltaic, and solar thermal panels reduce energy consumption by 88% from baseline.

 

 

Tassafaronga Village; Oakland, Calif.
David Baker Architects

Image: Matthew Millman (left)/Bruce Damonte (right)

This project includes a 60 unit affordable apartment building, 77 affordable attached "townhouses" for rent (clustered in 13 buildings), and 20 supportive apartments with onsite medical clinic. Deep roof overhangs, fin walls, site plantings, and thoughtful window placement provide resilience against heat spikes, relieving high southern, and hot western sun. The building design provides comfortable daylight, views, and airflow by increasing the exposure in individual rooms and units. All rooms within each unit meet the standard for natural ventilation under ASHRAE 62.22007. A well-insulated thermal envelope and reduced infiltration allow improved comfort and protection from odors, noise, and other pollutants.

 

 

University Center - The New School; New York City
Skidmore, Owings & Merrill LLP

Image: James Ewing

The LEED Gold building provides space for all aspects of a traditional campus, with 200,000 square feet of academic space on the first seven floors and 150,000 square feet for a 600-bed student residence on the levels above. A thermal energy storage unit was developed to create and store ice at night, smoothing the load of the building’s daytime operations and allowing systems to be both downsized and right sized. Constructed with an extensive 13,500-square-foot green roof, able to detain up to 40% of annual rainfall, this project enabled the design team to take advantage of a combined heat and power system, combining onsite generation with domestic hot water preheating for the dormitory areas, and a black water treatment system combined with low flow features reduce the building’s potable water consumption by 75% over baseline.

 

The 2015 COTE Top Ten Green Projects jury includes:

  • John Quale, LEED AP BD+C, Associate AIA, University of New Mexico School of Architecture + Planning
  • Alex Wilson, Resilient Design Institute
  • Peter Busby, C.M., FRAIC, MAIBC, LEED Fellow, Perkins+Will
  • Peter Rumsey, PE, Point Energy Innovations 
  • David John Neuman, Neu Campus Planning, Inc.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 12, 2010

University of Toledo, Memorial Field House

27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.

| Oct 12, 2010

Cell and Genome Sciences Building, Farmington, Conn.

27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Oct 12, 2010

Building 13 Naval Station, Great Lakes, Ill.

27th Annual Reconstruction Awards—Gold Award. Designed by Chicago architect Jarvis Hunt and constructed in 1903, Building 13 is one of 39 structures within the Great Lakes Historic District at Naval Station Great Lakes, Ill.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021