flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

Architects | Jun 6, 2023

Taking storytelling to a new level in building design, with Gensler's Bob Weis and Andy Cohen

Bob Weis, formerly the head of Disney Imagineering, was recently hired by Gensler as its Global Immersive Experience Design Leader. He joins the firm's co-CEO Andy Cohen to discuss how Gensler will focus on storytelling to connect people to its projects.

Mixed-Use | Jun 6, 2023

Public-private partnerships crucial to central business district revitalization

Central Business Districts are under pressure to keep themselves relevant as they face competition from new, vibrant mixed-use neighborhoods emerging across the world’s largest cities.

Urban Planning | Jun 2, 2023

Designing a pedestrian-focused city in downtown Phoenix

What makes a city walkable? Shepley Bulfinch's Omar Bailey, AIA, LEED AP, NOMA, believes pedestrian focused cities benefit most when they're not only easy to navigate, but also create spaces where people can live, work, and play.

Mixed-Use | Jun 1, 2023

The Moore Building, a 16-story office and retail development, opens in Nashville’s Music Row district

Named after Elvis Presley’s onetime guitarist, The Moore Building, a 16-story office building with ground-floor retail space, has opened in Nashville’s Music Row district. Developed by Portman and Creed Investment Company and designed by Gresham Smith, The Moore Building offers 236,000 sf of office space and 8,500 sf of ground-floor retail. 

| Apr 28, 2023

$1 billion mixed-use multifamily development will add 1,200 units to South Florida market

A giant $1 billion residential project, The District in Davie, will bring 1.6 million sf of new Class A residential apartments to the hot South Florida market. Located near Ft. Lauderdale and greater Miami, the development will include 36,000 sf of restaurants and retail space. The development will also provide 1.1 million sf of access controlled onsite parking with 2,650 parking spaces. 

Mixed-Use | Apr 27, 2023

New Jersey turns a brownfield site into Steel Tech, a 3.3-acre mixed-use development

In Jersey City, N.J., a 3.3-acre redevelopment project called Steel Tech will turn a brownfield site into a mixed-use residential high-rise building, a community center, two public plazas, and a business incubator facility. Steel Tech received site plan approval in recent weeks.

Green | Apr 21, 2023

Top 10 green building projects for 2023

The Harvard University Science and Engineering Complex in Boston and the Westwood Hills Nature Center in St. Louis are among the AIA COTE Top Ten Awards honorees for 2023. 

Urban Planning | Apr 17, 2023

The future of the 20-minute city

Gensler's Stacey Olson breaks down the pros and cons of the "20-minute city," from equity concerns to data-driven design.

Multifamily Housing | Apr 17, 2023

World's largest multifamily building pursuing ILFI Zero Carbon certification under construction in Washington, D.C.

The Douglass, in Washington, D.C.’s Ward 8, is currently the largest multifamily housing project to pursue Zero Carbon Certification from the International Living Future Institute (ILFI).

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021