flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The University of Chicago Harris School at the Keller Center

Reconstruction Awards

The University of Chicago Harris School at the Keller Center

Project team goes all out for LEED Platinum and the Living Building Challenge.


By Robert Cassidy, Executive Editor | November 25, 2019
North elevation of the University of Chicago Harris School at the Keller Center

Photos: Tom Rossiter

Extreme sustainability was the chief goal for the reconstruction of Edward Durrell Stone’s Kellogg Center for Continuing Education at the University of Chicago.

Mortenson (CM) and Farr Associates (architect) put Stone’s New Formalism structure, built in 1963, on track to be the healthiest building in the Chicago area—the first LEED Platinum on the Maroons’ campus, and only the third project in the city to seek Petal certification (materials, equity, beauty) from the Living Building Challenge.

To meet the LBC’s “red list” requirements, all materials used by trade partners had to be vetted for banned chemicals. The carbon footprint of laborers and trade partners was tracked to reduce greenhouse gas emissions.

En route to achieving those standards, Mortenson and its CM partner, minority-owned contractor Ardmore Roderick, exceeded the university’s social hiring goals: 59% MWBE participation (vs. a goal of 30%) and an amazing 81% minority labor participation (vs. a 40% goal).

 

Inside the University of Chicago Harris School at the Keller CenterThe wood for the Harris Family Forum was recycled from trees felled by the emerald ash borer. The Keller Center was originally built in 1963.

 

The CM team used Lean strategies (Last Planner, 5S) to streamline workflow and improve safety. The project had a total recordable incident rate of 0.71, compared to the industry standard of 3.20. MEP subcontractors were brought on early to provide design-assist expertise.

Farr Associates designed the 150,000 kWh/year rooftop PV system, which supplies 11% of the building’s energy, so that the 354 panels could be relocated in the event of future expansion of the Harris School of Public Policy.

The project team won a variance from the city to reduce the required size of the building’s green roof by installing a 15,000-gallon cistern, which stores rainwater for reuse in landscaping and toilet flushing, diverting 525,000 gallons of fresh water from the sewer system.

Three light courts were carved into the concrete structure to provide a balance of daylight between the borrowed light of perimeter windows across the deep floor plates.

 

SILVER AWARD WINNER

BUILDING TEAM Mortenson (submitting firm, CM) The University of Chicago (owner) Farr Associates (architect) Woodhouse Tinucci Architects (collaborating architect, interior designer) Stearn Joglekar, Ltd. (SE) dbHMS (MEP/FP) WJE (building forensics) Shen Milsom Wilke (acoustics/AV) WSP (LBC Red List consultant) site design group (landscape) Ardmore Roderick (CM partner) DETAILS 125,000 sf Total cost $60 million Construction time April 2017 to December 2018 Delivery method CM at risk

Related Stories

Reconstruction Awards | Nov 27, 2017

The birthplace of General Motors

The automotive giant salvages the place from which it sprang, 131 years ago.

Reconstruction Awards | Nov 21, 2017

Honor Guard: San Francisco’s historic Veterans Building pays homage to those who served in World War I and other foreign wars

The Veterans Building houses the War Memorial staff, the city’s Arts Commission, the Opera’s learning center and practice/performance node, the Green Room reception venue, and the 916-seat Herbst Theatre.

Reconstruction Awards | Nov 20, 2017

Eyes wide open: Students can see their new home’s building elements

The two-phase project revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s.

Reconstruction Awards | Nov 17, 2017

Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage

The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows.

Reconstruction Awards | Nov 17, 2017

Elegance personified: New life for a neglected but still imposing retail/office space

The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements.

Reconstruction Awards | Nov 16, 2017

Back to the '20s: Coney Island gets a new eatery reminiscent of the past

This project included the restoration of the landmark Childs Restaurant.

Reconstruction Awards | Nov 15, 2017

Foyer fantastique: Faded images provide the key to a historic theater's lobby restoration

The restoration relied heavily on historic photos and drawings.

Reconstruction Awards | Nov 14, 2017

Hallowed ground: A Mormon temple rises from the ashes of a fire-ravaged historic tabernacle

Parts of the tabernacle’s exterior shell were the only things that survived the blaze.

Reconstruction Awards | Nov 13, 2017

Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children

Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021