flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

TWA Hotel at JFK International Airport: Home away from home

Reconstruction Awards

TWA Hotel at JFK International Airport: Home away from home

A dormant, 1960s-era flight center is converted into a snazzy hotel and conference facility.


By John Caulfield, Senior Editor | December 6, 2019
TWA Hotel at JFK Airport

Photo: David Mitchell

This high-profile public-private redevelopment adapted the building’s 129,000-sf Flight Center, which hadn’t been used since 2001, into a massive lobby bookended by two wings with 512 hotel rooms, a subterranean 46,000-sf conference center with a 7,000-sf banquet hall and 43 meeting rooms, six restaurants, eight bars (including one that was built inside of the fuselage of a 1958 Lockheed Constellation jet), an observation deck, retail shops, and a rooftop pool. All of these are connected via an underground service system that links to JetBlue Terminal 5.

New mechanicals were added to support new amenity areas and the hotel’s operational spaces that surpass current hospitality and transportation industry performance standards. The hotel now has its own onsite, continuous-duty cogeneration plant that produces all of its electricity and heating independent of the airport’s utility grids. All of the lighting was converted to LEDs, and the sprinkler system was replaced.

 

HONORABLE MENTION

BUILDING TEAM Jaros, Baum & Bolles (submitting firm, MEP) MCR/MORSE Development (owner/developer) Beyer Blinder Belle (architect) Lubranco Ciavarra Architects (hotel designer) Stonehill Taylor (interior designer–hotel) INC Architecture & Design (interior designer–event spaces) Arup (SE) Turner Construction (CM) DETAILS 440,000 sf Total cost $265 million Construction time December 2016 to May 2019 Delivery method Design-bid-build

Related Stories

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

Reconstruction Awards | Nov 12, 2018

Cincinnati Music Hall: Saving a cultural anchor

Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021