The Thornton Tomasetti Board of Directors and Managing Principals announce the promotion of Thomas D. Poulos, P.E., S.E., to senior principal, and Edward M. Peck, AIA, LEED AP, Robert M. Stadler, P.E., S.E., and Adam Abbes Yala, Ph.D., P.E., to vice presidents in the Chicago office of the international engineering firm.
Poulos, who leads the firm’s aviation market sector, has been with Thornton Tomasetti since 1997. He has more than 20 years of experience leading complex projects for all types of structures, including design-build.
Peck, the leader of Thornton Tomasetti’s Midwest U.S. Building Skin practice, has been with the firm since 2008. He has more than 15 years of experience in architecture, building skin technologies, and building systems. Throughout his career, he has specialized in projects involving sustainable and innovative building skins, most notably ETFE (ethylene tetrafluoroethylene). He has provided building skin services for a wide range of building types including hospitals, performing arts venues, office buildings, and sports and entertainment facilities.
Stadler joined Thornton Tomasetti in 1998 and has broad exposure to projects of all sizes, from tenant build-outs to high-rise buildings and long-span structures. His work spans several market sectors, including residential, commercial, healthcare, aviation, cultural, educational, and sports facilities. He specializes in economical structural solutions using all types of building materials and has experience in building design in high seismic regions
Dr. Yala joined Thornton Tomasetti in 1999. He has provided structural design and analysis services from schematic design through construction administration for many major projects, including office, residential, hospitality, aviation, and sports facilities as well as special structures. He is also well-versed in building renovations and restorations, façade repairs, investigations, evaluations, condition assessment and litigation support. +
Related Stories
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.