flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 13, 2012

Congress’s action doesn’t mean Pentagon can’t build LEED gold structures

Though Congress passed a defense budget preventing the Department of Defense from spending money to achieve LEED gold or platinum certification, the Pentagon may still end up constructing buildings to those standards.

| Apr 13, 2012

International Living Building Institute certifies first two Net Zero Energy buildings

A community building in Oregon and an office building in California are the first two projects to earn net-zero status under the International Living Building Institute’s Net Zero Energy Certification program.

| Apr 13, 2012

New York City’s building department investigating structural collapse that killed worker

Following a worker’s death, the collapse of a century-old, two-story warehouse under demolition as part of Columbia University’s expansion is under investigation by the city’s Building Department.

| Apr 13, 2012

Federal court reduces statute of limitations for OSHA action on record-keeping violations

The U.S. Court of Appeals for the D.C. Circuit sharply curtailed the period of time that companies can be cited for Occupational Safety and Health reporting violations, reversing the decision of an administrative panel and longstanding agency precedent.

| Apr 13, 2012

CSI webinar: Green Construction Codes Are Here -- Now What?

This seminar will trace the origins of green codes, how they compare and differ from the rating systems that have been used, and examine some of their main features.

| Apr 5, 2012

Retailers, banks among most affected by new ADA rules

On March 15, the most significant changes to the Americans with Disabilities Act (ADA) since it became law in 1991 went into effect.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021