The Metropolitan Opera House in Philadelphia has had a rough history. Built in 1908 as one of the largest venues of its kind, the building survived two fires and sat vacant from 1988 until 1995, having been saved from demolition in 1994.
Twenty years later, a new owner, Eric Blumenfeld Realty Management, assembled a project team for a $56 million rehabilitation project to return the project to its former luster and create a 3,400-seat concert hall and special events center.
The exterior renovation focused on stabilizing and repairing the white brick and stucco building envelope. Many of the masonry features had crumbled, and the removal of the cornice had created structural problems. The cornice was accurately replicated with the help of historic photographs. New wood windows and storefronts replaced the originals with matching profiles. Large wood entry doors on Poplar Street were restored.
To support the building’s role as a live music venue, the team recreated signage that had been added to the building in 1928 when the Opera House was converted to a movie theater. A large metal rooftop sign and a large metal blade sign were replicated and placed in their original location at the northeast corner of the building.
The interior underwent a more dramatic renovation. After withstanding years of water infiltration and exposure to the freeze-thaw cycle, much of the ornamental plasterwork was damaged. Where possible, the plasterwork was preserved; where it was missing or heavily damaged, it was replaced to match. The coffered ceiling was also restored via a combination of preservation and replacement. Original terrazzo floors and mosaic tile border in the newly enlarged lobby were also salvaged and restored.
The Philadelphia Metropolitan Opera House, before renovation. Photo: Hugh L. Loomis Architectural/Industrial Photography.
New MEP and air-conditioning systems were installed and concealed to make the facility comfortable for concertgoers. Fire sprinklers and a smoke evacuation system were added to meet building and life-safety codes. A full kitchen was added in the basement. For the final touch, the auditorium itself was upgraded with new seating, lighting, sound systems, restrooms, back-of-house spaces, and a variety of bars and gathering spaces for concertgoers.
The completed project took a structure that was once a symbol of urban decline and turned it into a catalyst for further development along Philadelphia’s North Broad Street corridor.
BRONZE AWARD WINNER
BUILDING TEAM Atkin Olshin Schade Architects (submitting firm, architect) Eric Blumenfeld Realty Management (owner) L Studio (interior designer) David Chou & Associates (SE) Concord Engineering Group (MEP) Domus Construction (CM) DETAILS 136,000 sf Total cost $56 million Construction time May 2015 to March 2019 Delivery method CM at risk
Related Stories
Reconstruction Awards | Nov 27, 2017
The birthplace of General Motors
The automotive giant salvages the place from which it sprang, 131 years ago.
Reconstruction Awards | Nov 21, 2017
Mama mia! What a pizzeria!: It started as a bank nearly a century ago, now it’s a pizza parlor with plenty of pizzazz
The first floor features a zinc bar and an authentic Neapolitan pizza oven.
Reconstruction Awards | Nov 21, 2017
Honor Guard: San Francisco’s historic Veterans Building pays homage to those who served in World War I and other foreign wars
The Veterans Building houses the War Memorial staff, the city’s Arts Commission, the Opera’s learning center and practice/performance node, the Green Room reception venue, and the 916-seat Herbst Theatre.
Reconstruction Awards | Nov 20, 2017
Eyes wide open: Students can see their new home’s building elements
The two-phase project revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s.
Reconstruction Awards | Nov 17, 2017
Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage
The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows.
Reconstruction Awards | Nov 17, 2017
Elegance personified: New life for a neglected but still imposing retail/office space
The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements.
Reconstruction Awards | Nov 16, 2017
Back to the '20s: Coney Island gets a new eatery reminiscent of the past
This project included the restoration of the landmark Childs Restaurant.
Reconstruction Awards | Nov 15, 2017
Foyer fantastique: Faded images provide the key to a historic theater's lobby restoration
The restoration relied heavily on historic photos and drawings.
Reconstruction Awards | Nov 14, 2017
Hallowed ground: A Mormon temple rises from the ashes of a fire-ravaged historic tabernacle
Parts of the tabernacle’s exterior shell were the only things that survived the blaze.
Reconstruction Awards | Nov 13, 2017
Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children
Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.