On the 238th anniversary of the original Boston Tea Party, Mark DiNapoli, President and General Manager of Suffolk Construction’s Northeast Region, joined officials from the Boston Tea Party Ships & Museum to celebrate the raising and placement of the cupola on the roof of the museum structure. This milestone event marked the topping off of the $27 million, 18,700-sf project.
DiNapoli was joined by Shawn Ford, executive director and vice president of the Boston Tea Party Ships & Museum; Chris Belland, CEO of Historic Tours of America; and Michael Cantalupa, senior vice president of development of Boston Properties. Following the topping off, period actors representing the patriots of 1773 threw replica tea crates into Boston Harbor as a reenactment of the actions 238 years ago.
The Boston Tea Party Ships & Museum project was designed by Margulies Perruzzi Architects.
As construction manager, Suffolk is using state-of-the-art virtual models and collaboration tools to build this structure that will pay tribute to this seismic event in American history.
Building Information Modeling (BIM) helped the team coordinate the installation of extensive mechanical, electrical, and plumbing systems throughout the project, which will consist of a two-story bridge house pier structure supported by 47 steel piles and a 350-ton, 200-foot floating barge.
The pier building will contain a retail store, two re-enactment meeting rooms, and offices. Three historic replica ships will surround the floating barge, which will house a museum on the first floor and a Tavern/Tea Room on the second level. More than 50% of construction will take place off barges on the water.
The Boston Tea Party Ships & Museum will offer a unique museum experience for visitors. There will be interactive tours, actors dressed in period clothing, cutting edge exhibits, and living history programs that allow anyone at any age the chance to reenact history from 1773. Another special feature of the museum will be the display of the Robinson Tea Chest, one of only two known tea chests that still exist from the original Boston Tea Party event. BD+C
Related Stories
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.
Student Housing | Apr 12, 2024
Construction begins on Auburn University’s new first-year residence hall
The new first-year residence hall along Auburn University's Haley Concourse.
K-12 Schools | Apr 11, 2024
Eric Dinges named CEO of PBK
Eric Dinges named CEO of PBK Architects, Houston.
Construction Costs | Apr 11, 2024
Construction materials prices increase 0.4% in March 2024
Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.
Healthcare Facilities | Apr 11, 2024
The just cause in behavioral health design: Make it right
NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.
K-12 Schools | Apr 10, 2024
A San Antonio school will provide early childhood education to a traditionally under-resourced region
In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
University Buildings | Apr 10, 2024
Columbia University to begin construction on New York City’s first all-electric academic research building
Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces.
K-12 Schools | Apr 10, 2024
Surprise, surprise: Students excel in modernized K-12 school buildings
Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction?
Industrial Facilities | Apr 9, 2024
Confessions of a cold storage architect
Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.
Cultural Facilities | Apr 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.